Sydney storms bring heavy rain, wind and falling trees. Damage ranges from a few lifted roof tiles to collapsed retaining walls and flooded basements. What you do first protects people, limits damage and helps your insurance claim.
Immediately after a storm
- Stay safe: keep clear of fallen powerlines, damaged structures and leaning walls or trees.
- Call for emergency help where needed. The NSW SES assists with storm emergencies such as temporary roof covers.
- Turn off power at the switchboard if water is near electrics, if safe to do so.
- Photograph everything before anything is moved.
- Contact your insurer or strata manager.

Make-safe
Temporary works stop further damage: tarps over roofs, propping damaged structures, fencing off unsafe areas and removing fallen debris. Keep receipts; insurers often cover reasonable make-safe costs.
Common storm damage
- Roof damage and leaks.
- Water damage to ceilings, walls and floors. See water damaged ceilings.
- Fallen trees on roofs, fences and walls.
- Collapsed or leaning retaining walls.
- Flooded basements and subfloors.
- Damaged facades, windows and balustrades.
Structural checks
Impact from trees, saturated ground under footings and retaining wall failures can affect the structure. Get structural damage assessed before permanent repairs.
Permanent repairs
Once the cause and extent are known, permanent repairs restore the structure, waterproofing and finishes. Insurers usually want an itemised scope and quote.
Storm damage repairs in Sydney
We carry out make-safe works, structural repairs and full reinstatement, with itemised scopes for insurers. See our remedial building services or call 0415 840 500, 7 days.
Frequently asked questions
What should I do first after storm damage?
Stay safe, call emergency services where needed, photograph the damage, and contact your insurer or strata manager.
Does insurance cover storm damage?
Many home and strata policies cover storm damage, but check your policy. Gradual leaks and lack of maintenance are often excluded.
Who does temporary repairs after a storm?
The SES can help in emergencies, and builders carry out make-safe works such as tarping, propping and fencing.


