Many apartment and commercial buildings have car parks on suspended slabs, with more parking, storage or shops below. When water gets through, it drips onto cars, stains ceilings and corrodes the reinforcement in the slab. A traffic deck coating is a waterproofing system designed to be driven on.
Why car park slabs fail
- Cracks from shrinkage and movement let water through.
- Construction and expansion joints fail.
- Water from cars, rain blowing in and washing carries salt and chlorides into the slab.
- Rusting reinforcement leads to concrete cancer in car parks.

What a traffic deck coating is
Usually a multi-layer system, often polyurethane, epoxy or similar, with:
- A primer bonded to prepared concrete.
- A flexible waterproof base coat that bridges fine cracks.
- A wearing coat with aggregate for grip.
- A top coat resistant to UV, fuel and tyre wear.
Heavier systems are used on ramps and turning areas where wear is greatest.
Signs your deck needs work
- Drips or stains on the ceiling or cars below.
- Worn-through coating in driving aisles and turning areas.
- Cracks, rust stains or spalling on the slab or soffit below.
- Ponding water on the deck.
The repair process
- Investigate leaks and test the concrete where corrosion is suspected.
- Carry out concrete repairs and crack and joint repairs.
- Prepare the surface by grinding or shot blasting.
- Apply the coating system, with joints detailed.
- Re-line and re-sign the car park.
Managing residents' cars
Work is usually staged by zone so most of the car park stays in use. Residents are given notice to move cars, and curing times are planned so zones return to service quickly.
Car park waterproofing in Sydney
We repair and waterproof car park decks for strata and commercial buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is a traffic deck coating?
A waterproofing coating system designed to be driven on, usually multi-layer with a flexible waterproof base and a hard-wearing, grippy top coat.
Why is water dripping onto cars in our car park?
Water is getting through cracks, joints or worn coatings in the deck above. It also carries salt that corrodes the slab reinforcement.
Can the car park stay open during the work?
Usually, yes. Work is staged by zone so most bays stay in use, with notice given to move cars.


