Thousands of Sydney strata schemes live in red brick walk-up blocks built from the 1960s to the 1980s. They are solid, well located buildings, but they are now 40 to 60 years old, and the same problems show up again and again.
1. Balconies
Many still have their original waterproofing, or none. Typical faults are leaks into the unit below, drummy tiles, poor falls and no step-down at the door. See signs of balcony failure and door thresholds.

2. Concrete cancer
Balcony slabs, slab edges and stair landings often have thin concrete cover. Carbonation and, near the coast, chlorides corrode the steel. See what causes concrete cancer.
3. Rusted lintels
Steel lintels over windows and doors rust and expand, cracking the brickwork above. See lintel replacement.
4. Wall ties
Cavity walls are held together with steel ties that corrode over time, causing horizontal cracking and bulging. See wall tie replacement.
5. Roofs and gutters
Original tiles, ridge pointing, flashings and gutters reach the end of their life. See apartment roof leaks.
6. Showers and bathrooms
Original bathrooms often had minimal waterproofing. Leaks into units below are common. See leaking showers.
7. Balustrades
Steel balustrades set into slab edges rust and crack the concrete, and many do not meet current heights. See balustrade repairs.
8. Damp in ground floor units
Failed damp courses and poor drainage on sloping sites. See rising damp treatments.
What to fix first
- Safety: loose concrete, loose balustrades.
- Water getting in: balconies, roofs and walls, because water drives most other damage.
- Structure: lintels, wall ties and concrete cancer before they spread.
- Finishes: render, paint and tiles last.
Plan it as one programme
These blocks usually need several of these repairs. Planning them together around one scaffold, funded through the capital works plan, is much cheaper than fixing one problem at a time.
Walk-up remedial specialists
We repair balconies, concrete, brickwork and waterproofing on red brick walk-ups across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What are the most common problems in 1960s and 1970s apartment blocks?
Leaking balconies, concrete cancer, rusted lintels, corroded wall ties, ageing roofs, leaking showers and corroded balustrades.
Is a red brick walk-up a Class 2 building?
Yes. A walk-up apartment block with two or more separate dwellings is a Class 2 building, so remedial work can fall under the DBP Act.
Should we fix everything at once?
Prioritise safety and water entry, then plan the rest as a programme. Grouping work around one scaffold usually saves money.