Rising damp is groundwater drawn up into masonry walls when the damp proof course has failed or was never installed. It brings salts that destroy render, plaster, mortar and bricks. There are several ways to treat it, and the best result usually combines them.
First, confirm it is rising damp
Damp low on walls can also come from leaking pipes, garden beds against walls, high ground levels, poor drainage or condensation. Treating rising damp when the cause is something else wastes money. See rising damp treatment and cost.
Treatment methods
Chemical damp proof course injection
Holes are drilled into the mortar line at the base of the wall and a water-repellent cream or fluid is injected to form a new barrier. The most common method in Sydney homes.
Physical damp proof course replacement
Sections of masonry are cut out and a new physical damp course inserted. More invasive, often used on heritage buildings or where chemical methods are not suitable.
Lowering ground levels
Removing garden beds, paving or soil built up above the original damp course. Often essential and sometimes enough on its own.
Drainage and ventilation
Ag drains, correct grades, downpipes connected to stormwater and clear subfloor vents reduce the moisture available. See damp subfloors.
Repair the salt damage
Even after the damp is stopped, salts remain in the wall. Salt-contaminated render and plaster must be removed, and walls re-rendered with salt-resistant systems once dry. Skipping this step is why many damp treatments seem to fail.
Heritage walls
Older masonry needs breathable materials such as lime render. Sealing old walls with cement render can push damp higher.
Rising damp treatment in Sydney
See our rising damp service or call 0415 840 500.
Frequently asked questions
What is the best treatment for rising damp?
Usually a combination: a new damp proof course (chemical or physical), lowering ground levels, drainage, and replacing salt-damaged render and plaster.
Does damp proof course injection work?
It is effective when the problem is genuinely rising damp and the salt-damaged finishes are also replaced.
How long do walls take to dry after rising damp treatment?
Masonry dries slowly, often over months, depending on wall thickness and conditions. Final finishes should wait until walls are dry.


