Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Removing Paint From Old Brick: A Heritage Owner's Guide

5 November 2026 · 4 min read · By the METCON team

Painted brick is common on Sydney's terraces and older homes in places such as Surry Hills, Annandale and Newtown. Owners often want to bring back the original look, or find the paint is peeling and trapping damp. But the wrong removal method can cause permanent damage.

Why old paint causes problems

  • Modern acrylic and sealing paints can trap moisture in old walls.
  • Trapped moisture and salts can make paint bubble and damage the brick face.
  • Peeling paint lets water in, but not out.
Older brickwork needs methods and materials that suit it.
Older brickwork needs methods and materials that suit it.

Before you strip anything

  1. Test a small area. See what is under the paint, because it may be poor brick, patches or cement repairs.
  2. Test for lead. Older paint often contains lead, which is hazardous when sanded or blasted.
  3. Check heritage controls. Removing paint from a listed home or in a conservation area may need approval. See heritage approvals.
  4. Find any damp source. Fix the cause, or the new finish will fail too. See rising damp.

Why you shouldn't sandblast

Old bricks have a hard outer face protecting a softer interior. Sandblasting or aggressive high-pressure washing can remove that face. Then water soaks in and bricks can start to crumble. See brick fretting.

Safer methods

  • Poultice or chemical strippers: applied, left to work and removed carefully.
  • Low-pressure steam or water: with care, and tested first.
  • Hand tools: for detailed or delicate areas.

All methods should be tested on a small area first, with waste collected. Lead needs proper controls and disposal.

If you decide to keep it painted

Sometimes the best answer is not to strip. The brick may have been painted because it was poor quality, or stripping could cause damage. In that case, remove what is loose and use a breathable coating such as a mineral or limewash product where suitable.

Repairs after stripping

  • Replace badly damaged bricks with matching ones.
  • Rake out cement joints and repoint in lime. See lime vs cement.
  • Avoid sealers unless there is a good reason, as they can trap moisture.

How the right approach helps your home

A careful job lets walls breathe, keeps bricks sound and brings back character that buyers value. Repainting less often is a useful bonus. See Victorian terrace repairs.

Heritage brickwork

We test first, use careful methods and repair heritage brickwork with suitable materials. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can you sandblast paint off old brick?

It is generally not recommended. Sandblasting can remove the hard outer face of old bricks, leaving them exposed to water damage and crumbling.

Is it OK to paint heritage brick?

If it is unpainted, usually leave it that way. If it is already painted, a breathable coating is often better. Check any heritage controls first.

Does old paint contain lead?

Often, in older homes. Test before sanding or stripping, and use proper controls and disposal.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote