Decorative breeze blocks, or screen blocks, were everywhere in Sydney apartment buildings from the 1950s to the 1970s: around stairwells, balconies, laundries and car ports. Many buildings are proud of them. But after 50 or more years, some of these walls are no longer as strong as they look.
Common problems
- Cracked or broken blocks, especially at corners and tops of walls.
- Rust staining from steel reinforcement or ties in the joints.
- Walls leaning or moving when pushed.
- Mortar joints eroded or missing.
- Loose capping blocks on top of walls.
Why they deteriorate
Screen walls are thin and open, so wind, rain and salt reach every face. Many were built with minimal reinforcement or ties into the main structure. Corroding steel in the joints expands and cracks the blocks. Where they form balustrades or stair enclosures, their strength matters for safety.
Safety check
Where a breeze block wall acts as a balustrade or sits beside a path or stair, have it checked by an engineer. A wall that moves or has loose blocks should be made safe straight away.
Repair or replace
- Repair: replace broken blocks, repoint, add stainless steel ties or reinforcement where the engineer specifies.
- Rebuild: take down and rebuild with proper reinforcement and fixings, reusing sound blocks or matching new ones.
- Replace: where a balustrade function is needed, a new compliant barrier may be added behind or in place of the wall. See balustrade rules.
Keep the character
Matching blocks are still made in many classic patterns, so repairs can keep the building's look. Heritage-listed or conservation area buildings may need council approval for changes.
Masonry repairs
We repair, rebuild and strengthen breeze block and masonry walls on older apartment buildings. See brickwork repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can you still buy matching breeze blocks?
Many classic patterns are still made. Some sizes or colours may need a close match rather than an exact one.
Are breeze block balustrades compliant?
Older ones often are not to current rules for height and openings. Get them assessed, especially on upper levels.
Can a leaning breeze block wall be straightened?
Usually not safely. It is normally taken down and rebuilt with proper reinforcement.


