Many Sydney apartment balconies built before current standards have balustrades that are lower than today's rules, with gaps a child could fit through or horizontal rails that are easy to climb. Owners often ask whether they must be upgraded.
The current requirements in brief
Under the National Construction Code, where a balcony is more than 1 metre above the surface below, a barrier is needed. In general terms:
- The barrier must be at least 1 metre high above the balcony floor.
- Openings must not let a 125 mm sphere pass through.
- Where the fall is more than 4 metres, elements between 150 mm and 760 mm above the floor must not make it easy to climb, such as horizontal rails.
- Barriers must be strong enough for the loads set out in the standards, including their fixings.
These are summaries. The exact requirements depend on the building's classification and the edition of the Code that applies, so the engineer or certifier confirms them for each project.
Do older balustrades have to be upgraded?
Existing buildings are not automatically required to meet every new rule. But there are important exceptions:
- When balustrades are replaced, the new ones should meet current requirements.
- Owners corporations have a duty to keep common property safe and in good repair. A barrier that is loose, corroded or dangerous must be fixed.
- Insurers and strata managers increasingly flag low or climbable barriers as a risk.
Common problems
- Posts corroded where they are set into the slab edge, which also cracks the concrete.
- Low masonry walls with a short rail added on top.
- Horizontal "ladder" style rails.
- Glass panels with corroded or loose fixings. See glass balustrade problems.
Do it with balcony remediation
If balconies are being waterproofed or repaired, it is the best time to replace balustrades, because the fixings often go through the same slab edge being repaired. See balustrade replacement.
Balustrade upgrades
We replace balcony balustrades on apartment buildings as part of balcony remediation, with engineer-checked fixings. See balcony repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
What is the minimum balcony balustrade height in NSW?
Generally 1 metre above the floor where the fall is more than 1 metre, under the National Construction Code. The certifier or engineer confirms the requirements for each project.
Must our old balustrades be replaced?
Not always, but unsafe or failing barriers must be fixed, and new ones should meet current rules. Get advice for your building.
Can we add height to an existing balustrade?
Sometimes, if the engineer confirms the posts and fixings can take the extra load.