Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Balcony Balustrade Replacement for Strata Buildings

9 November 2026 · 4 min read · By the METCON team

Many older apartment buildings have original steel or aluminium balustrades that are rusting, loose or below current safety expectations. Replacing them improves safety and appearance, and done right, can also fix leaks where posts go through the balcony.

When to replace

  • Posts are loose, rusted or cracking the concrete around them. See loose balustrades.
  • Height or gaps are a concern. See balustrade heights.
  • Glass panels are damaged or fixings are corroded.
  • The balcony is being re-waterproofed anyway.
A finished balcony after repairs.
A finished balcony after repairs.

Options

TypeProsWatch for
GlassViews, modern lookCleaning, glass to the right standard, fixings
AluminiumLight, corrosion resistant, lower costFinish quality near the coast
Stainless steelStrong, durableGrade matters near salt water
Masonry or renderedSolid lookWeight, cracking and water entry

Fixing details matter

Posts drilled down through a balcony membrane are a common leak point. Side or face fixing to the slab edge, or properly sealed base fixings, can protect the waterproofing. The fixing must also suit the condition of the concrete, so check for concrete cancer first. See concrete cancer signs.

Approvals

  • Strata approval, since balustrades are often common property.
  • Council or heritage approval may be needed where the appearance changes.
  • Engineering and compliance with current standards.
  • DBP Act requirements may apply on Class 2 buildings.

Planning a building-wide program

  • Combine with balcony waterproofing to save on access and disruption.
  • Choose one consistent design for the building.
  • Program stack by stack to reduce disruption.
  • Arrange temporary barriers while balustrades are removed.

How replacement helps

New balustrades make balconies safe, stop leaks at fixings and refresh the look of the whole building, which helps values.

Balustrade replacement

We replace balustrades and repair balconies together, with approvals and records in order. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

When should balcony balustrades be replaced?

When posts are loose or rusted, fixings are failing, safety is a concern or the balcony is being re-waterproofed anyway.

Which balustrade is best near the coast?

Glass with suitable fixings, good-quality aluminium or a suitable stainless grade. Ask about corrosion resistance for your exposure.

Do balustrades cause balcony leaks?

They can, where posts are fixed through the membrane. Side fixing or properly sealed fixings help prevent this.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote