Cracked or Dropped Brick Arches: Causes and Repairs

9 November 2026 · 4 min read · By the METCON team

Brick arches over windows and doors are a feature of many Victorian and Federation homes and older apartment blocks. When an arch cracks or bricks drop, it is usually a sign of movement or a failing support. Most can be repaired without major works if dealt with early.

Signs of a problem

  • A crack through the arch, often at the centre or the springing points.
  • Bricks or a keystone dropping out of line.
  • Cracks running up from the arch into the wall above.
  • Sticking windows or doors below.
Older brickwork with arched openings.
Older brickwork with arched openings.

Common causes

  • Movement: footing movement or clay soils. See clay soils.
  • Rusting steel: hidden steel bars or flat arches with steel behind. See lintels.
  • Failed mortar: old lime mortar washed out.
  • Removed support: past alterations that took away support.
  • Window frames: rotting frames that were carrying some load.

How arches are repaired

  • Repointing: where mortar has failed but bricks are in position. See repointing.
  • Stitching: stainless steel bars in the joints to tie cracked brickwork. See brick stitching.
  • Temporary support and reset: propping the arch, then resetting dropped bricks.
  • Rebuilding: taking down and rebuilding the arch on a former, with matching bricks and mortar.
  • Adding support: a new lintel behind or above, designed by an engineer.

Fix the cause

If movement is ongoing, fix the cause too: drainage, plumbing or footings. Otherwise the arch will crack again. See crack repair costs.

Heritage homes

Use matching bricks and suitable lime mortar. See lime vs cement.

How repair helps

A repaired arch protects the opening and the wall above, and keeps an important character feature of the home.

Brick arch repairs

We repair and rebuild brick arches, matching original materials. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Is a cracked brick arch serious?

It can be. It often signals movement or a failing support. Get it checked, especially if bricks have dropped.

Can a dropped brick arch be repaired?

Yes. Depending on the damage, it can be stitched, reset or rebuilt, with extra support where needed.

Why do brick arches crack?

Common causes are footing movement, rusting steel, failed mortar and past alterations.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote