The price of fixing a crack depends less on how big it looks and more on what caused it. A hairline crack in plaster and a crack from moving footings can look similar at first, but one is a small repair and the other can be a major project.
The usual repairs, from small to large
| Repair | Used for |
|---|---|
| Patch and paint | Stable hairline cracks in plaster and render. |
| Repointing | Cracks in mortar joints without wider movement. See repointing. |
| Brick stitching | Stable cracks through brickwork. See brick stitching. |
| Lintel replacement | Cracks caused by rusting steel. See lintel replacement. |
| Drainage repairs | Movement caused by leaking pipes, stormwater or poor site drainage. |
| Underpinning | Footings that have moved and are still moving. See underpinning cost and process. |

What affects the price
- The cause: fixing the cause is usually the bigger part of the bill.
- Number and location of cracks: high walls and upper floors can need scaffold.
- Wall type: face brick needs matching bricks and mortar, while render and plaster need a good finish.
- Heritage: lime mortars and matching materials take more time. See lime vs cement.
- Engineering: reports, designs and certification may be needed. See when you need an engineer.
- Finishes: painting, plastering and tiling after the repair.
Work out the cause before you pay
- Take dated photos with a ruler next to each crack.
- Note whether they open and close with the seasons, or keep growing.
- Check for sticking doors, sloping floors and leaks nearby.
- Get a builder or engineer to inspect before you get a patch-up quote.
See types of cracks and are cracks serious?
Why painting over it can cost more
Patching a moving crack means it will return, and it can hide what is happening from a future buyer's inspector. Find the cause first, and you only pay once.
How the right repair helps your home
A proper repair restores strength and appearance, keeps water out of the wall and gives you peace of mind. It also helps you avoid a nasty surprise in a pre-sale inspection. See repairs before selling.
Get your cracks checked
We inspect cracks across Sydney, and bring in structural engineers where needed. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does it cost to fix a crack in a wall?
Stable surface cracks may be a small job, while cracks from moving footings can require underpinning. The cause sets the price, so an inspection comes first.
Should I fix a crack before painting?
Yes, once you know it has stopped moving. Painting over a moving crack will not last.
Do I need an engineer for wall cracks?
For wide, stepped or growing cracks, or where floors and doors are moving, an engineer's advice is usually a good idea.


