Most buyers get a pre-purchase building inspection. If it finds damp, leaks, cracking or concrete cancer, it can lead to a price renegotiation, a cancelled sale or a long campaign. Fixing the right problems before you list puts you in control.
What building inspectors commonly flag
- Moisture readings and damp in walls. See rising damp.
- Cracks in walls, ceilings and slabs. See ceiling cracks.
- Leaking showers and wet area damage. See leaking showers.
- Roof leaks and stained ceilings.
- Balcony and deck problems. See balcony failure.
- Concrete cancer on garages, balconies and stairs.
- Poor drainage and water ponding against the house.
- Damp subfloors and timber rot.

What to fix, and what to leave
Fix
- Active leaks, because water stains and moisture readings alarm buyers.
- Safety issues such as loose balustrades.
- Problems that look worse than they are, such as visible cracks or damp marks with a simple cause.
Consider leaving
- Large projects where buyers may want to make their own choices, as long as you are upfront about them.
Do not just cover it up
Painting over damp or filling cracks without fixing the cause will be found by a good inspector, and can create legal problems. Fix the cause, and keep the records.
Get your own inspection first
A pre-sale inspection shows you what buyers will see. You can then fix issues, get quotes for others, and present the information honestly.
Documents that help your sale
- Engineer reports and sign-offs.
- Waterproofing certificates and warranties.
- Before and after photos.
- Invoices from licensed contractors.
See also does remedial work add value.
Pre-sale remedial repairs
We inspect and fix the issues that come up in building reports, with documentation you can give buyers. METCON is a licensed builder (384697C) with heritage and structural remedial experience across Sydney. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Should I fix rising damp before selling?
Usually, yes. Moisture readings and damp marks worry buyers and lead to lower offers. Documented repairs reassure them.
Is it worth getting a building inspection before selling?
Yes. It shows you what buyers will see and lets you fix issues or get quotes before negotiations start.
Can I just paint over cracks and damp before selling?
No. Inspectors usually find the cause, and covering defects can create legal problems. Fix the cause and keep the records.

