Repointing means removing old, failed mortar and replacing it. It keeps water out of brick walls, stops bricks loosening and can transform the look of a building. The price varies with several factors.
Signs you need repointing
- Mortar that is crumbling, sandy or recessed.
- Gaps between bricks.
- Damp patches inside walls.
- Bricks that are loose or fretting. See brick fretting.

What affects the cost
- Area: the total wall area to be repointed.
- Joint depth: joints need raking out to a good depth.
- Mortar type: lime mortar for heritage brickwork takes more care. See lime vs cement.
- Removing cement: hard cement from past repairs takes longer to remove without damaging bricks.
- Joint finish: special profiles, such as tuck pointing, add time.
- Access: scaffold for upper levels and chimneys. See chimneys.
- Brick replacement: badly damaged bricks may need replacing.
- Cleaning: removing mortar stains afterwards.
Partial or full repointing?
Patch repointing can be cost-effective where damage is local, such as near a downpipe or at ground level. Full repointing may be better where most joints have failed, for a consistent look.
Fix the cause
If mortar failed because of water, such as a leaking gutter or rising damp, fix that first. See rising damp.
How repointing helps
Good repointing keeps water out, protects the bricks, reduces damp inside and gives the home a crisp, cared-for look, which matters for value and street appeal. See repointing brickwork.
Get a repointing quote
We repoint brickwork on homes, heritage buildings and apartment blocks. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How much does repointing cost?
It depends on area, joint depth, mortar type, access and how much old cement needs removing. An inspection gives an accurate price.
Should heritage brick be repointed with lime?
Usually, yes. Lime mortar suits soft old bricks and lets the wall breathe.
How long does repointing last?
Well-done repointing can last many decades, especially when the cause of any damp is fixed.


