Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Retaining Wall Repairs in Strata Buildings

19 November 2026 · 4 min read · By the METCON team

Many Sydney apartment buildings sit on sloping blocks, with retaining walls along driveways, car parks, gardens and boundaries. They are often decades old, built without drainage and never inspected. When they start to lean or crack, the owners corporation needs to act.

Warning signs

  • The wall leaning out, or a bulge in its face.
  • Cracks that widen, step through brickwork or run through the base.
  • Soil or water coming through the face.
  • Blocked or missing weep holes, and wet ground behind the wall.
  • Paths or driveways above the wall cracking or sinking.
  • Rotting timber sleepers or rusted steel posts.

Who is responsible?

Retaining walls inside the strata scheme are usually common property, so the owners corporation must maintain and repair them under section 106. Walls on a boundary may involve the neighbour too. Walls supporting a public footpath may involve council. Check the strata plan and survey. See the duty to repair.

Why they fail

Most retaining wall failures come down to water. Without drainage behind the wall, water pressure builds up after rain. Other causes are walls built too thin for their height, footings that were never designed, tree roots, and added loads such as cars parked above.

Repair or rebuild

  • Repair: clearing drainage, adding weep holes, repointing, replacing failed sleepers.
  • Strengthen: engineer-designed anchors, buttresses or a new wall in front.
  • Rebuild: remove and rebuild to an engineer's design, with drainage.

Walls over a certain height, or supporting structures, driveways or boundaries, need engineering, and may need council approval. See retaining wall drainage.

If it is moving now

Fence off the area below and above, keep cars away from the top of the wall and get it inspected quickly. Retaining walls can fail suddenly after heavy rain.

Retaining wall works for strata

We repair and rebuild retaining walls for strata schemes and coordinate the engineering. See retaining walls and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Does the owners corporation have to fix a boundary retaining wall?

If it is common property, yes. If it is shared with a neighbour, responsibility depends on who owns it and what it supports. Get it surveyed if unsure.

Can we just add weep holes?

Sometimes, if the wall is sound and drainage is the only problem. An engineer should confirm before you rely on it.

Does a retaining wall rebuild need approval?

Often yes, depending on height, location and what it supports. We check this with the engineer before pricing.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote