Structural Cracks in Apartment Buildings: When to Worry

19 November 2026 · 4 min read · By the METCON team

Every apartment building has cracks. Most are shrinkage or movement cracks in render, plaster or brickwork that look worse than they are. Some point to a structural problem. Knowing the difference helps committees spend money in the right place.

Usually not structural

  • Fine hairline cracks in render or paint.
  • Cracks at the corners of windows and doors that do not change.
  • Cracks along plasterboard joints.
  • Short cracks at the junction of different materials.
Cracking and spalling where reinforcement has corroded.
Cracking and spalling where reinforcement has corroded.

Get it assessed

  • Cracks wider than a few millimetres, or getting wider.
  • Stepped cracks through brickwork, especially near corners.
  • Cracks in concrete slabs, beams or columns, especially with rust staining.
  • Doors and windows that stick across several units.
  • Floors that are out of level or sloping.
  • Bulging walls, or brickwork moving away from the frame.

Common causes in strata buildings

  • Concrete cancer: rusting reinforcement expanding and cracking the concrete. See signs of concrete cancer.
  • Corroded wall ties: the outer brick skin coming loose from the inner wall. See wall tie replacement.
  • Foundation movement: reactive clay, leaking drains or trees.
  • Rusted lintels: steel over openings expanding and cracking brickwork.
  • Thermal movement: roof slabs and parapets moving with heat.

Monitoring

If the cause is unclear, crack monitoring over a few months shows whether cracks are moving. Simple gauges fixed across the crack, read regularly, give the engineer real data.

Repairs

The fix depends on the cause: concrete repair, wall tie replacement, brick stitching, lintel replacement, crack injection, or underpinning where foundations have moved. Fixing the crack without fixing the cause means it comes back. See types of cracks.

Crack assessment and repair

We work with structural engineers to diagnose and repair cracking in apartment buildings. See crack repairs and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Who should assess a crack in a strata building?

Start with a remedial builder or engineer. Where it may be structural, a structural engineer should assess it and design the repair.

Is a crack in my unit the owners corporation's problem?

Cracks in structural walls, slabs and the building envelope are usually common property. Cracks in your own internal finishes may not be.

Can cracks be a building defect?

In newer buildings, yes. Structural defects can be major defects with a six year warranty.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote