Boundary Walls and Fences in Strata Schemes: Repairs

20 November 2026 · 4 min read · By the METCON team

Old brick boundary walls and fences around apartment buildings take a beating from tree roots, water, cars and time. When one leans, cracks or falls, the owners corporation needs to work out who is responsible and fix it safely.

Warning signs

  • Leaning or bulging brick walls.
  • Large cracks, especially through the base or piers.
  • Loose cappings and bricks.
  • Walls also holding back soil, acting as retaining walls.
  • Roots lifting footings.

A leaning masonry wall can fall without much warning. Fence off the area on both sides and get it assessed. See leaning brick fences.

Older brickwork needs regular checks for cracks and movement.
Older brickwork needs regular checks for cracks and movement.

Who is responsible?

  • Wall inside the scheme: usually common property, maintained by the owners corporation.
  • Dividing fence on the boundary: usually shared with the neighbouring owner. NSW has rules about sharing fencing costs between adjoining owners. Get advice for your situation.
  • Retaining wall: responsibility often depends on whose land it supports and who created the level difference. See retaining walls in strata.

Working with the neighbour

  1. Talk early, in writing, with photos.
  2. Agree on the problem and the fix.
  3. Agree on cost sharing and access.
  4. Record the condition of both sides before work. See dilapidation reports.

Repair or rebuild?

  • Repair: repointing, replacing cappings, stitching cracks.
  • Rebuild: taking down and rebuilding on new footings, sometimes with steel reinforcement.
  • Replace: a new fence type, if allowed by council and the by-laws.

Walls over a certain height, or retaining soil, need engineering and may need approval.

Boundary wall repairs

We repair and rebuild boundary walls and fences for strata schemes. See brickwork repairs and retaining walls. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Does the neighbour have to pay half?

For a dividing fence, there are rules for sharing the cost of a sufficient fence. Retaining walls are treated differently. Get advice.

Can we replace a brick wall with a lighter fence?

Often, if council rules, heritage controls and the by-laws allow it.

Who is liable if a boundary wall falls on someone?

Possibly the owner responsible for the wall, if it was known to be unsafe. Act on warning signs quickly.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote