Stormwater Pits and Trench Drains on Private Sites

23 November 2026 · 4 min read · By the METCON team

Every driveway, courtyard and paved area needs to shed water. On Sydney's sloping sites, water running down a driveway towards a garage or house is one of the most common causes of flooding. Stormwater pits and trench drains catch it and send it to the stormwater system.

Types of collection

  • Grated pits: square pits with a grate, at low points in paving and courtyards.
  • Trench drains: long channels with grates, often across the bottom of a driveway or in front of a garage door.
  • Junction and inspection pits: where pipes meet or change direction, allowing cleaning.

Load class

Grates are rated for the loads they will carry. A grate in a garden path does not need to take a car; one across a driveway does, and one in a truck area needs more again. Using the wrong class leads to broken grates and channels.

Getting the levels right

  • Paving must fall to the pit or drain.
  • The drain must be sized for the area draining to it.
  • Outlet pipes must fall to the discharge point.
  • A trench drain at the bottom of a steep driveway may need help from a second drain higher up.

See stormwater on sloping blocks.

Where the water goes

Collected water must go to an approved point: the street kerb, an inter-allotment drain, an on-site detention tank or an absorption system, depending on the site and council. Connections to the stormwater system are done by a licensed plumber or drainer. See drainage easements and OSD tanks.

Maintenance

Pits and trench drains fill with leaves and silt. Clean them before storm season and after big storms. Blocked drains are a common cause of garage and basement flooding.

Drainage and paving works

We install pits, trench drains and pipework as part of driveways, courtyards and civil works, with licensed drainers for connections. See concrete works. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.

Frequently asked questions

Why does water still get into my garage with a trench drain?

The drain may be too small, blocked, or water may be bypassing it at the ends. A second drain higher up the driveway often helps.

Can stormwater go into the sewer?

No. Stormwater must not be connected to the sewer in NSW.

What grate do I need for a driveway?

One rated for vehicle loads. Ask the supplier for the load class.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote