When a site is built on, roofs and paving send rainwater off far faster than gardens did. Across a suburb, that overloads council's drains and causes flooding downstream. Many Sydney councils therefore require on-site stormwater detention (OSD) for new houses, duplexes, units and commercial developments.
How OSD works
An OSD system collects stormwater from roofs and paved areas and stores it temporarily. A small, controlled outlet, often an orifice plate, releases it slowly to the street or council pipe. In a big storm, an overflow takes the excess safely.
Types of OSD
| Type | Typical use |
|---|---|
| Below-ground concrete tank | Under driveways or paths; durable and trafficable |
| Precast or modular tanks | Faster to install where access allows |
| Above-ground tanks | Some smaller sites, where allowed |
| Surface storage | Shallow storage in landscaped or paved areas |
Design and approval
A hydraulic engineer designs the OSD to the council's policy: the storage volume, outlet size and overflow. The design is part of the development approval or construction certificate.
Building it
- Excavation to the design depth, with shoring if needed.
- Base slab, walls and lid in reinforced concrete, or a precast or modular system.
- Pipes, inlet pits, outlet control and overflow, installed by licensed drainers.
- Access grates and step irons for maintenance.
- Inspections and an as-built survey for certification.
Accuracy matters. Levels and the outlet size must match the design, or certification can fail.
Maintenance
OSD systems need regular cleaning of screens, pits and the tank, especially after storms. Blocked outlets make the tank overflow early. Councils can require owners to maintain them, and the obligation is often noted on title.
OSD tank construction
We build the civil and concrete works for OSD systems, working with your hydraulic engineer and drainer. See concrete works and excavation. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
Does every house need OSD?
No. It depends on the council, the site and the development. Your DA or certifier will say if it is required.
Is a rainwater tank the same as OSD?
No. Rainwater tanks store water for reuse. OSD holds water temporarily and releases it. Some systems combine both.
Can an OSD tank go under the driveway?
Yes, a trafficable concrete tank under the driveway is common on tight sites.