Excavating into a slope for a house, driveway or basement leaves a cut face that has to stay stable. If there is room, the face can be battered back at a safe angle. On tight Sydney sites there often is not. Soil nails and rock anchors are two engineered ways to hold a steep cut in place.
Soil nails
Soil nails are steel bars drilled into the soil or weathered rock at a slight downward angle, then grouted in. They reinforce the ground itself. The face is usually covered with shotcrete and mesh, with plates and nuts on each nail. They are installed from the top down, row by row, as excavation progresses. See shotcrete walls.

Rock anchors and bolts
In sandstone, rock bolts pin loose blocks or bedding planes in place, and rock anchors tie larger rock masses or retaining walls back into sound rock deeper in. Some anchors are tensioned to actively hold a wall. They are common in Sydney's sandstone cuts beside driveways and basements. See rock excavation in sandstone.
When they are used
- Cuts too high or too steep to batter back.
- Excavation close to a boundary or a neighbour's structure.
- Stabilising existing failing slopes or rock faces.
- Tying back retaining walls instead of building massive gravity walls.
Design and approvals
- A geotechnical report and engineer's design are essential. See geotechnical reports.
- Anchors that extend under a neighbour's land need their consent.
- Temporary anchors may need to be de-stressed after permanent structures are built.
Drainage
Water behind a cut face adds pressure. Designs include drainage strips, weep holes or drilled drains so water can escape.
Slope and cut stabilisation
We carry out excavation and slope stabilisation works with specialist drilling partners, to the geotechnical engineer's design. See engineered retaining walls. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
Are soil nails permanent?
They can be designed as permanent or temporary. Permanent nails have corrosion protection for a long design life.
Can anchors go under my neighbour's land?
Only with their consent, usually documented in an agreement.
Do soil nailed walls look raw?
The shotcrete face can be finished, coloured, or covered with a facing wall or landscaping.