When a site is cleared and excavated, bare soil washes away in the first heavy rain. It ends up in gutters, stormwater pipes, creeks and Sydney Harbour. NSW councils and environmental laws require builders to control erosion and sediment on every site.
Why it matters
- Sediment pollutes waterways and blocks council drains.
- Mud on roads is a safety hazard.
- Councils and regulators can issue fines and stop-work orders.
- Uncontrolled runoff can undermine excavations and neighbouring land.
The basic controls
| Control | What it does |
|---|---|
| Sediment fence | Filter fabric fence on the low side to trap soil |
| Stabilised site entry | Rock or rumble grid so trucks do not track mud onto the road |
| Kerb and pit inlet protection | Stops sediment entering street drains |
| Diversion drains | Direct clean water around disturbed areas |
| Covered stockpiles | Soil and sand kept away from drains and covered |
| Early stabilisation | Turf, mulch or matting on finished areas |
The plan
Most consents require an erosion and sediment control plan. The widely used NSW guide is Landcom's "Blue Book", Managing Urban Stormwater: Soils and Construction. Controls go in before earthworks start and stay until the site is stabilised.
Maintenance
- Inspect controls after every rain event.
- Repair damaged fences and remove trapped sediment.
- Sweep the road, never hose mud into the drains.
- Keep concrete washout and slurry out of stormwater.
Slopes and creeks
Sites on slopes or near waterways need extra care, with staged clearing and stronger controls. See creek bank protection.
Clean, compliant sites
We set up and maintain erosion and sediment controls on our civil and excavation sites. See site clearing and civil works. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
Do small jobs need sediment controls?
Any job that disturbs soil can wash sediment into drains. Small sites still need basic controls.
Who is responsible on site?
The builder or principal contractor, and the owner can also be liable. Check the consent conditions.
Can concrete washout go in the gutter?
No. Concrete slurry harms waterways. It must be contained on site.