Your neighbour below says water is coming through their ceiling, and it seems to be from your apartment. It is stressful, but a quick, calm response protects everyone, including you.
This is general information from a builder, not legal or financial advice. Your strata manager, lawyer or accountant can advise on your situation.
First steps
- Stop any obvious water: turn off taps or the water to an appliance if something is clearly leaking.
- Look at the ceiling below with your neighbour and take photos.
- Tell your strata manager or building manager in writing.
- Tell your insurer if there is damage.
- If you rent, tell your agent or landlord straight away.

Where the water may come from
- Bathroom: failed shower waterproofing or grout. See shower leaks.
- Pipes: leaking taps, pipes or appliance hoses.
- Balcony: failed membrane or blocked drains. See balcony leak detection.
- Laundry or kitchen: washing machine or dishwasher hoses.
- Common pipes: sometimes the water is not from your apartment at all.
Who is responsible?
- Common property: waterproofing membranes, slabs and common pipes are often the owners corporation's responsibility.
- Your lot: fixtures inside your apartment, like taps and appliances, are often yours.
- Your renovations: if you or a past owner renovated a bathroom or balcony, by-laws may make that work your responsibility.
Your strata plan and by-laws decide this. See who is responsible for repairs.
Finding the source properly
Use a plumber for pipes and a builder or leak specialist for waterproofing. Testing one area at a time is the reliable way to isolate a leak.
Fixing it
- Plumbing leaks can usually be fixed quickly.
- Failed waterproofing generally needs tiles removed and a new membrane.
- Once fixed, the ceiling below needs to dry before repair. See water damaged ceilings.
Being a good neighbour
Keep your neighbour informed, give access for inspections, and respond quickly. That makes it much less likely to become a dispute.
Leak inspections and repairs
We find and fix leaks in apartment buildings, working with owners and strata managers. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Who pays when my apartment leaks into the unit below?
It depends on the source. Common property waterproofing is often the owners corporation, while fixtures and owner renovations may be the owner's. Check your strata plan and by-laws.
What should I do first if my apartment is leaking downstairs?
Stop any obvious water, take photos, tell your strata manager in writing, and contact your insurer.
How do you find a leak between apartments?
By testing one possible source at a time, such as plumbing, the shower and the balcony, to isolate where the water comes from.


