Owners and residents are the first to notice balcony problems. A quick check a couple of times a year, and after big storms, helps catch issues while they are small.
The checklist
Drains
- Is the drain clear of leaves, dirt and grout?
- Does water drain quickly after rain?
Floor
- Is water pooling anywhere after rain?
- Are tiles cracked, loose or hollow when tapped?
- Are there white deposits in grout lines?
Door
- Is the floor inside dry near the balcony door after rain?
- Are skirting boards swelling or mouldy?
Edges and underside
- Any rust stains, cracks or missing concrete on the edge?
- Any stains on the ceiling of the balcony below, if you can see it?
Balustrade
- Does it move when pushed firmly?
- Is there rust at the base or fixings?
Additions
- Have screens, air conditioners or pots been fixed through the floor?
- Is air conditioner water draining onto the tiles?

When to report
Report any leak, movement, rust or falling concrete to your strata or building manager in writing, with photos. See signs of balcony failure.
Simple care
- Keep drains clear.
- Don't drill into the floor. See fixings that leak.
- Avoid very heavy pots and spas. See loads on balconies.
How it helps
Early reports mean smaller repairs and less damage to your apartment and your neighbours'.
Balcony inspections
If something doesn't look right, we can inspect it. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How often should I check my balcony?
A couple of times a year and after big storms.
What balcony problems should I report to strata?
Leaks, ponding, cracked or loose tiles, rust, movement and any falling concrete.
Can I clean my balcony drain myself?
Yes. Keeping drains clear of debris is one of the best things you can do.


