Balcony Remediation Week by Week: What Owners Will See

23 November 2026 · 4 min read · By the METCON team

Owners often ask what will actually happen on their balcony once remediation starts. Every building is different, but most balcony remediations follow the same stages. Knowing them helps owners plan around the work.

Before work starts

  • A notice from the strata manager or builder with dates and access times.
  • A condition survey: photos of your balcony, doors and the unit next to it.
  • A request to clear the balcony of furniture, pots and anything stored there.

See pre-start condition surveys.

Waterproofing membranes are applied in stages with curing time between coats.
Waterproofing membranes are applied in stages with curing time between coats.

Stage 1: protection and strip-out

Doors and windows are protected. Old tiles, screed and membrane are removed. This is the noisiest stage, with demolition hammers and rubble removal.

Stage 2: inspection and concrete repairs

With the slab exposed, the builder and engineer inspect it. Concrete cancer is marked, cut out and repaired. Drains, upstands and door thresholds are corrected. This stage varies the most, because the extent of damage is only known now.

Stage 3: screed and falls

A new screed is laid so water runs to the drain. It needs time to cure before waterproofing.

Stage 4: waterproofing and testing

The membrane goes on, with extra attention at the door, the edges and the drain. It is left to cure, then often flood tested to prove it holds water. See balcony flood testing.

Stage 5: tiling and finishing

New tiles, grout and sealants. Balustrades are refitted or replaced. Protection is removed and the balcony is cleaned.

How long it takes

A single balcony usually takes a few weeks from strip-out to tiling, mostly because of curing times between stages. Whole-building programs run balconies in groups, so each owner's balcony is out of use for a defined period. Weather can add time.

Tips for owners

  • Keep the balcony door shut and locked during works.
  • Expect noise during strip-out and concrete repairs, mostly in set working hours.
  • Report any leaks or damage to the builder straight away.
  • Ask for photos of your slab repairs. A good builder records them.

Balcony remediation

We remediate balconies in occupied apartment buildings with clear notices, photos and staging. See balcony repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can I use my balcony during remediation?

No. It is a work area from strip-out until the new tiles are finished and cured.

Do I need to be home?

Usually not, if access is via scaffold or the builder has agreed access arrangements. Some stages may need internal access.

Why does it take weeks if the work is small?

Screeds, repair mortars and membranes all need curing time. Rushing them is a common cause of failure.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote