Remedial works involve vibration, scaffold, foot traffic through common areas and work right outside people's units. When the works finish, someone will say the builder damaged their ceiling, tiles or floor. A pre-start condition survey settles those questions with evidence.
What is recorded
- Common areas: lobbies, stairs, corridors, lifts, paths and gardens.
- Inside units next to the work areas, with owners' permission.
- Existing cracks, stains, damaged tiles, chipped paint and water marks.
- Neighbouring buildings and walls, where works are close to the boundary.
Each item is photographed and described, with locations, and the report is dated and shared.
Why it helps everyone
| Without a survey | With a survey |
|---|---|
| Arguments over whether damage was already there | Photos show the starting condition |
| The builder pays for old damage, or owners go without for new damage | Genuine new damage is fixed quickly |
| Committee caught in the middle | Clear process to follow |
When to do it
Just before works start, once scaffold locations and work areas are known. A follow-up survey at completion, of the same areas, closes the loop.
Owners who refuse access
Some owners will not allow access. Record the refusal in writing. It limits later claims about damage inside that unit.
Neighbours
Where works are close to a neighbouring building, excavation, demolition or scaffold, a dilapidation report on the neighbour's property protects the owners corporation too. See dilapidation reports.
Condition and dilapidation reports
We prepare condition surveys and dilapidation reports before remedial and building works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or request a report or quote. Report fees are fixed and agreed in writing before we start.
Frequently asked questions
Who should pay for the condition survey?
It is often part of the remedial contract. If it is not, the owners corporation can commission it separately before works start.
Do owners get a copy?
Owners should get a copy of the pages for their unit. It is their evidence too.
Is a video enough?
A dated video helps, but a written report with numbered photos and locations is much easier to rely on in a dispute.


