Old balcony tiles can make an apartment look tired, and many owners want to replace them. But in most apartment buildings, the balcony slab and waterproofing are common property, and tiles often sit directly over the membrane. Changing them can affect the whole building.
This is general information from a builder, not legal or financial advice. Your strata manager, lawyer or accountant can advise on your situation.
Why approval is usually needed
Works that affect common property, including waterproofing, generally need approval from the owners corporation, often by special resolution and a by-law under the Strata Schemes Management Act. The by-law can set out who maintains the new work. See renovation by-laws.

Risks of tiling over or replacing tiles
- Damaging the existing membrane when removing tiles.
- Raising the floor and reducing the step at the door. See thresholds.
- Blocking drains or changing falls. See pooling water.
- Adding weight to the slab.
- Covering up existing leaks or concrete cancer.
Doing it properly
- Talk to your strata manager first.
- Get a builder to inspect the existing balcony and membrane.
- Prepare a scope, including waterproofing, falls and drainage.
- Get approval, including any by-law.
- Use licensed trades for waterproofing, with flood testing and photos. See how to waterproof a balcony.
- Give the owners corporation copies of certificates and photos.
Time it with building works
If your building is planning balcony repairs, wait. You may be able to choose finishes as part of the project, or upgrade at your own cost while the balcony is already stripped back.
Who is responsible later?
If you change common property, a by-law may make you responsible for maintaining it. Understand this before you start.
How doing it right helps
You get the new look, without risking leaks into the apartment below or a bill to fix the building's waterproofing.
Balcony works in strata buildings
We re-waterproof and re-tile balconies in apartment buildings, with approvals and records in order. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Do I need strata approval to re-tile my balcony?
Usually, because the slab and waterproofing are generally common property. Speak to your strata manager first.
Can I tile over existing balcony tiles?
It may raise the floor, block drains, add weight and hide problems. Get the balcony inspected first.
Who pays if my new balcony tiles leak?
It depends on by-laws and approvals. If you changed common property, you may be responsible for that work.