Pedestal pavers sit on adjustable supports above a waterproof membrane. Water drains through the joints and runs across the membrane to the outlets underneath. They are common on roof terraces and podiums, and can suit some balconies.
Advantages
- The membrane is protected from sun and traffic.
- A level walking surface over a sloping membrane.
- Pavers can be lifted for inspection and repairs.
- Can help where door sill heights are a problem.

Things to check
- Height: pedestals need room, which may raise the surface. Check doors, balustrade heights and thresholds. See balustrade heights.
- Load: heavier pavers add weight to the slab.
- Wind: lighter pavers on high, exposed balconies may need restraint.
- Debris: leaves and dirt collect under pavers and around outlets, so maintenance access matters.
- Membrane: the membrane below must be suitable and properly detailed.
Where they work best
- Roof terraces and penthouse terraces. See penthouse terrace leaks.
- Podiums and communal areas. See podium waterproofing.
- Larger balconies with enough height.
Strata considerations
Changing a balcony finish may need approval. A consistent system across the building is usually best. See balcony approvals.
How they help
Pedestal systems can extend membrane life and make future repairs easier, which reduces long-term costs.
Terrace and balcony systems
We install waterproofing and finishes on balconies, terraces and podiums. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What are pedestal pavers?
Pavers sitting on adjustable supports above a waterproof membrane, with water draining through the joints to outlets below.
Are pedestal pavers good for apartment balconies?
They can be, where there is enough height and suitable detailing. They are especially common on roof terraces and podiums.
Do pedestal pavers need maintenance?
Yes. Leaves and debris collect underneath, so outlets should be checked and cleared.


