When a Lot Owner's Renovation Damages Common Property

18 November 2026 · 4 min read · By the METCON team

Apartment renovations often touch common property: waterproofing, walls, floors, pipes and structure. When something goes wrong, the question is who pays to fix it.

What owners need approval for

Under the Strata Schemes Management Act 2015, renovations fall into three groups:

TypeExamplesApproval
Cosmetic workPainting, carpets, picture hooksGenerally no approval
Minor renovationsKitchen changes, some flooring, some wiringGeneral resolution
Other workWaterproofing, structural changes, bathroom works affecting common propertySpecial resolution and usually a by-law

Check your by-laws and strata manager for exact requirements.

A bathroom membrane: renovations that disturb it can leak into units below.
A bathroom membrane: renovations that disturb it can leak into units below.

Bathrooms are the big one

Bathroom renovations disturb the waterproofing membrane, which often sits on or forms part of common property. A poor membrane leaks into the unit below. See bathroom renovation by-laws.

Who pays when it goes wrong

  • A by-law approving the work usually makes the owner responsible for ongoing maintenance and any damage it causes.
  • If an owner did work without approval, the owners corporation can require it to be fixed or removed.
  • The owners corporation may still need to repair common property and recover the cost from the owner.

Common damage from renovations

  • Leaks through new showers and floor wastes.
  • Cracked slabs from heavy demolition.
  • Cut or damaged fire separation and penetrations. See fire stopping defects.
  • Removed walls that turned out to be load-bearing. See load-bearing walls.
  • Hard flooring causing noise complaints.

Protecting the building

  1. Require details of the work, the builder's licence and insurance.
  2. Require a licensed waterproofer and a waterproofing certificate.
  3. Record the condition of nearby common property before work starts.
  4. Inspect at key stages, especially before tiling.

Fixing renovation damage

We investigate leaks and rectify waterproofing and structural damage in apartment buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can strata make an owner rip out a renovation?

If work affecting common property was done without approval, the owners corporation may be able to require it to be fixed or removed. Get advice.

My neighbour's new shower is leaking into my unit. What do I do?

Report it in writing to the strata manager and the neighbour with photos. A leak investigation can confirm the source.

Does strata insurance cover damage from a renovation?

It depends on the policy and the cause. Defective work by an owner's builder may not be covered.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote