Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Commercial

Mixed-Use Buildings: Leaks Between Apartments and Shops

4 November 2026 · 4 min read · By the METCON team

Apartments above shops are common in the city and on busy strips such as Crows Nest, Haymarket and Surry Hills. When water leaks from one part of the building to another, it can stop a business trading and start an argument about who pays. A clear process helps with both.

Common leak sources

  • Podiums and planters above shops or car parks. See podium waterproofing.
  • Bathrooms and kitchens in apartments above. See water leaking from above.
  • Stormwater and sewer pipes in ceilings over retail spaces.
  • Balconies and facades where water tracks down through the building.
  • Tenant works such as exhaust ducts, flues or signs that have cut through waterproofing.
  • Grease and floor waste systems in restaurant tenancies.
Water tracks through buildings and can appear a long way from its source.
Water tracks through buildings and can appear a long way from its source.

Who is responsible?

This depends on the way the building is set up, for example:

  • Single strata scheme: shops and apartments are lots in one scheme, and the owners corporation usually looks after common property.
  • Stratum or part strata: the building may be divided into parts, with a strata management statement and building management committee sharing costs.
  • Leases: a commercial lease can set out what the tenant and landlord each pay for.

A shop tenant usually needs to talk to the landlord, who then deals with the strata manager or building manager. See who is responsible for repairs.

What to do when a leak starts

  1. Protect people, stock and electrics. Turn off power to affected equipment if it is safe.
  2. Report it in writing to the landlord, strata manager or building manager.
  3. Take photos and record the date, time, weather and what was running above.
  4. Tell your insurer about any loss.
  5. Arrange a proper investigation of the source. See strata leak emergencies.

Repairing without stopping trade

  • Temporary protection, catch trays and ceiling access to keep shops open.
  • Out-of-hours or night work for noisy tasks.
  • Staged repairs so that only a small area is affected at a time.
  • Clear communication with each tenant, so they can plan around the works.

How the right repair helps

Fixing the cause protects rent, reduces disputes and insurance claims, and keeps tenants happy. A leak that keeps returning can make a shop hard to lease, which affects the value of the whole building.

Help for mixed-use buildings

We trace and repair leaks in mixed-use buildings and plan the works around trade. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Who pays for a leak from an apartment into a shop?

It depends on where the leak starts and the strata plan, management statement or lease. Common property is usually the owners corporation, while a fault inside a lot may be the owner.

Can repairs be done without closing my shop?

Often, yes. Temporary protection, staging and out-of-hours works can keep a shop trading in many cases.

What is a strata management statement?

It is a document used in some mixed-use buildings that sets out how shared parts are run and how costs are divided between the different parts of the building.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Commercial Construction
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote