Restaurant, pub and hotel kitchens are tough on buildings. Daily wash-downs, hot water, grease, heavy equipment and chemicals can all break down floors. When a kitchen floor leaks, it can affect a shop, car park or apartment below. It is also an issue for food safety, so it is worth fixing properly the first time.
Common causes
- Failed membranes: old membranes under tiles, or kitchens with none at all.
- Cracked tiles and grout: water and grease get through.
- Floor drains: poor connections between the waste and membrane.
- Grease arrestors: leaking pits, lids and pipes.
- Coving and wall junctions: wall joints fail and water gets into walls.
- Equipment: fixings and heavy equipment that penetrate or crack floors.
- Fitout changes: new pipes and fixings installed through old waterproofing.

Warning signs
- Stains or drips in the ceiling below.
- Grease odours or smells in the space below.
- Loose or drummy tiles. See drummy tiles.
- Water sitting on the floor after cleaning.
- Rust or spalling in the slab below.
What a proper repair looks like
- Find the source: test drains, plumbing and floors separately.
- Protect the area: plan closure, equipment removal and hygiene.
- Strip back: remove failed tiles, screeds and membranes.
- Repair the slab: cracks and any concrete damage, and correct the falls.
- Install the system: a membrane or flooring system that suits kitchen heat and chemicals.
- Detail carefully: drains, kerbs, coves and penetrations.
- Test and record: flood test and photos before finishes go down.
- Finish: a hygienic, non-slip finish.
Repairing with minimum downtime
- Plan works for closures, quieter weeks or overnight in stages.
- Consider fast-curing systems, with advice on whether they suit the floor.
- Prepare temporary kitchen or delivery arrangements.
- Talk with your landlord, strata manager and neighbours early on.
- Check food authority and council requirements for any changes. See restaurant fitouts.
Who pays?
That depends on the lease, the strata plan and the cause. Often tenants look after fitout elements, while the owner looks after building fabric, but check your lease. In mixed-use buildings, see leaks between apartments and shops.
How it helps your business
A sound floor protects your trade, hygiene and neighbours. It reduces repair call-outs, and it is far better to choose the time for a planned shutdown than be forced into closing during your busy period. For hotels, see planned maintenance.
Commercial kitchen repairs
We repair and waterproof commercial floors and plan the work around trading. See our commercial remedial service. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why is my restaurant kitchen leaking through the floor?
Common causes are failed membranes, cracked tiles and grout, poor drain connections and grease arrestors. Testing helps pinpoint it.
Can a commercial kitchen stay open during floor repairs?
It can be hard, but staged works, overnight works and planned closures can reduce downtime.
What flooring is best for a commercial kitchen?
It depends on your use, but flooring should be durable, non-slip, easy to clean and suitable for heat and chemicals, with a reliable membrane where needed.

