Fire Stopping Defects in Apartment Buildings

23 November 2026 · 4 min read · By the METCON team

Fire safety defects are among the most common serious defects reported in NSW apartment buildings. A big share of them are hidden: gaps where pipes, cables and ducts pass through fire-rated walls and floors without proper fire stopping.

Why it matters

Apartment buildings are divided into fire compartments so a fire in one unit is contained long enough for people to escape. Every hole through a fire-rated wall or slab for plumbing, electrical or air conditioning must be sealed with a tested fire stopping system. An unsealed gap can let smoke and fire spread to other units, corridors and stairs.

Where defects are found

  • Riser cupboards with pipes and cables passing through slabs.
  • Ceiling spaces above corridors and unit entries.
  • Walls between units where services cross.
  • Around air conditioning pipes and ducts added after construction.
  • Where renovations or new cabling have disturbed existing seals.

How it is fixed

  1. A fire safety inspection identifies and records each penetration.
  2. Each one is sealed with a tested system that suits the service type and the wall or floor, such as collars, wraps, sealants or batts.
  3. Work is done by appropriately accredited installers, labelled and photographed.
  4. Documentation goes into the building's records and supports the annual fire safety statement.

Remedial works often find more

When ceilings and walls are opened during remedial works, fire stopping defects often show up. Budget for them, and make sure any new penetrations made during the works are properly sealed. See fire door defects.

Fire safety rectification

As part of defect rectification we coordinate accredited fire stopping installers, make good linings and keep records for the building. See defect rectification. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Can expanding foam be used for fire stopping?

Only products tested and approved for the specific situation. Ordinary expanding foam is not a fire stopping system.

Who is responsible for fire stopping in strata?

Fire-rated walls and slabs are usually common property, so the owners corporation is responsible for keeping them compliant.

Do new air conditioners affect fire stopping?

Yes. Any new penetration through a fire-rated element must be sealed with a tested system.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote