Stair, Handrail and Balustrade Defects in Apartments

18 November 2026 · 4 min read · By the METCON team

Common stairs, handrails and balustrades get heavy use and are often decades old. Defects are a real fall risk for residents and visitors, and the owners corporation has a duty to keep them in good repair.

Common defects

DefectRisk
Loose or corroded handrail fixingsHandrail gives way
Uneven or cracked treadsTrips and falls
Spalling stair edgesFalling concrete and trips
Low or climbable balustradesFalls from height, especially children
Gaps in balustradesChildren slipping through
Slippery surfacesSlips in wet weather
Stair works need edge protection and careful staging.
Stair works need edge protection and careful staging.

Today's standards

The National Construction Code sets requirements for new work, such as balustrades at least 1 metre high where the fall is more than 1 metre, openings that do not let a 125 mm sphere pass through, and limits on climbable elements on higher floors. Older buildings may not meet current standards, but repairs and replacements generally need to. See balustrade heights.

Concrete stairs

External concrete stairs often suffer concrete cancer at the nosings and edges, where cover to the steel is thin and water sits. Repairs follow the same break-out, treat and rebuild method as balconies. See concrete stair repairs.

Steel balustrades and handrails

Corrosion at the base of posts and fixings is the most common failure. It is often hidden by paint or tiles. See loose and rusted balustrades.

What committees should do

  1. Include stairs and balustrades in regular building inspections.
  2. Push-test handrails and balustrades for movement.
  3. Make urgent hazards safe straight away.
  4. Plan replacement to current standards, with an engineer where needed.

Stair and balustrade repairs

We repair and replace stairs, handrails and balustrades in apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Do we have to upgrade old balustrades to current standards?

Not always for existing work left alone, but replacements and major repairs generally need to comply. A safety risk should be fixed regardless.

Is replacing balustrades on a Class 2 building regulated?

Work on balustrades can be regulated building work under the DBP Act, depending on the element. We confirm what applies.

How do I know if a handrail is safe?

Any movement, rust at fixings or cracking around posts needs checking. If in doubt, keep people off it and get it inspected.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote