Many apartment owners notice damp carpet, swollen skirting boards or mould just inside the balcony door. The water usually comes from the balcony, not a plumbing leak.
How water gets in
- Under the door sill, when the balcony floor is too close to the door. See thresholds.
- Through low or failed membrane upstands at walls. See upstands.
- Through the door frame itself, at corners and seals. See sliding doors.
- Water ponding against the door because of poor falls.
- Blocked drains with no overflow.

How to tell
- It gets worse after rain, especially wind-driven rain.
- Carpet grippers and skirtings rust or swell near the door.
- Mould grows low on walls near the balcony.
Finding the source
Water testing the door frame, sill and balcony floor separately shows where it gets in. See leak detection.
Fixing it
- Clear and upgrade drains, and add an overflow.
- Repair or replace door seals and frames.
- Rework the sill with a proper set-down and membrane detail.
- Re-waterproof the balcony where the membrane has failed.
- Dry and repair floors and walls inside, and treat mould. See mould after a leak.
Who is responsible?
Balcony waterproofing and door frames are often common property, but check your strata plan. See who is responsible.
How fixing it helps
Stopping the water protects floors, walls and health, and stops repeat repairs inside.
Balcony leak repairs
We find and fix balcony leaks into apartments. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why is my carpet wet near the balcony door?
Water is often getting in under the sill, through low upstands or the door frame, especially in wind-driven rain.
Is it the balcony or a plumbing leak?
If it gets worse after rain, it is usually the balcony or door. Plumbing leaks happen regardless of weather.
Who fixes water coming in from the balcony?
Often the owners corporation, because balcony waterproofing and frames are usually common property. Check your strata plan.


