If you can see or smell mould, an inspection should answer three questions: where is it, how far has it spread, and what water is feeding it. Without the third answer, the mould will come back.
What a building mould inspection covers
- Visible mould: where it is and how much.
- Moisture readings: in walls, floors and ceilings to find damp areas.
- Likely sources: leaks, rising damp, condensation, roof and balcony problems.
- Hidden areas: behind furniture, inside cupboards, under floors and in roof spaces.
- Ventilation: exhaust fans, subfloor vents and airflow.
- Photos and a written summary.

Air and surface testing
Air and surface sampling can measure mould spores and identify types. It is useful for health concerns, disputes or clearance after remediation. Independent occupational hygienists usually do this. See removal vs remediation.
Builder inspection vs hygienist
| Builder inspection | Hygienist testing |
|---|---|
| Finds and fixes the building cause | Measures spores and contamination |
| Leaks, damp, ventilation and repairs | Health concerns, disputes and clearance |
Many jobs benefit from both.
Strata and rentals
Inspections help work out who is responsible, such as the owners corporation for common property leaks. See mould in apartments and mould in rentals.
After the inspection
You should get a clear plan: fix the source, remove affected materials, dry and rebuild. See mould remediation costs.
How an inspection helps
It stops you paying to clean mould that will come back, and focuses your money on the real problem.
Mould inspections and repairs
We inspect for the building causes of mould and fix them. See our mould remediation service. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What does a mould inspection include?
Visible mould, moisture readings, likely sources, hidden areas, ventilation, and photos with a written summary.
Do I need mould air testing?
It is useful for health concerns, disputes or clearance after remediation, and is usually done by occupational hygienists.
Who should inspect mould in my home?
A builder to find and fix the building cause, and a hygienist where testing is needed.


