Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Mould Inside Walls: How to Tell and What to Do

11 November 2026 · 4 min read · By the METCON team

Mould inside walls grows where water has been getting in unseen: a leaking shower, a failed balcony, a dripping pipe or rising damp. By the time it shows on the surface, it has often spread inside.

Signs of mould inside walls

  • A musty smell that won't go away. See musty smells.
  • Bubbling paint, stains or soft plasterboard.
  • Skirting boards swelling or lifting.
  • Mould spots appearing along the base or top of walls.
  • Health symptoms that improve when you are away from home. Talk to your GP.
Affected linings removed so the wall can dry.
Affected linings removed so the wall can dry.

Common causes

How it is found

  1. Moisture meter readings across the wall.
  2. Thermal imaging in some cases, to show cold, damp areas.
  3. Small inspection openings where needed.
  4. Checking the likely water source.

See mould inspections.

How it is fixed

  1. Fix the water source.
  2. Cut out affected plasterboard and insulation, with containment.
  3. Clean and treat the framing, and replace rotten timber.
  4. Dry the wall cavity fully.
  5. Rebuild with suitable linings and finishes.

Don't just paint over it

Mould paint or bleach on the surface won't reach mould inside the wall, and the moisture keeps it growing.

How fixing it helps

Removing hidden mould and fixing the water makes the home healthier, stops smells and prevents timber decay.

Hidden mould repairs

We find and fix the cause and remove mould-affected materials. See our mould remediation service. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How do I know if there is mould inside my walls?

Persistent musty smells, bubbling paint, stains, soft plasterboard and swollen skirting are common signs.

Can mould inside walls be removed without demolition?

Usually some linings need to be cut out to remove mould properly and dry the cavity.

Will bleach kill mould inside walls?

No. Surface treatments do not reach mould inside the wall, and the moisture source must be fixed.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote