When a home owner lodges a building complaint, NSW Fair Trading may send an inspector to the site. Owners sometimes assume that visit replaces an expert report. It does not. The two do different jobs.
What the Fair Trading inspection is for
Fair Trading's building dispute process aims to get the owner and the builder to agree on what is fixed. The inspector looks at the items in dispute and may record them in a site report, and a rectification order can follow in some cases. It is a dispute resolution step, and it is often quick.
What it usually does not do
- It does not usually cost each defect.
- It may not go into the cause in depth or open up work to test it.
- It is not written for you, and it is not written to the Tribunal's expert evidence rules.
- It may not cover every item you are worried about.
What an independent expert report does
- Covers every item you instruct the expert to look at.
- Explains the cause and which plan, contract term, standard or code each item fails.
- Sets out the rectification scope, item by item.
- Costs each item, with a total you can claim.
- Complies with NCAT Procedural Direction 3 or the court's expert code when it needs to.
Side by side
| Fair Trading inspection | Independent expert report | |
|---|---|---|
| Purpose | Resolve the complaint | Prove the claim |
| Who decides the scope | Fair Trading | Your instructions |
| Costing | Usually not | Itemised |
| Written to expert evidence rules | No | Yes, when needed |
| Timing | During the complaint | Before NCAT, or before the complaint |
Should you get both?
Usually yes. Go through Fair Trading because NCAT expects it. Get the independent report so you know what the claim is worth, can negotiate from facts, and have evidence ready if it goes to the Tribunal. Many owners get the report first, so the complaint to Fair Trading is precise.
Using the Fair Trading report
If the inspector agrees an item is defective, your expert can rely on that and cost it. If the inspector disagrees, your expert can explain why, with reasons and evidence.
Independent reports in Sydney
We prepare building defect reports and NCAT expert reports with itemised costs. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.
This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.
Frequently asked questions
Is the Fair Trading inspection binding?
It is not a Tribunal decision. It can lead to agreement or a rectification order, and it can be used as evidence, but the Tribunal decides disputes on all the evidence.
Can my expert attend the Fair Trading inspection?
Often yes. It can help to have someone explain the defects on site. Ask Fair Trading about attendance when the visit is arranged.
What if Fair Trading says it is not a defect?
You can still pursue the claim at NCAT. An independent expert report that explains why it is defective, with reasons, is how you do that.