Home Services Demolition & Excavation Structural Demolition Sydney
/ Structural Demolition · Sydney

Bring it down.
Properly.
Safely.

We plan, permit, and execute structural demolition across Sydney. Full building demolition, heavy concrete and steel removal, and site clearing. Licensed, insured, and methodically documented.

40+ YRS
Building Sydney
LICENSED
Demolition works
FREE
No-obligation quote
/ Structural demolition · On site
Full structural demolition · Sydney site
Licensed NSW Builder Full Building Demolition Concrete & Steel Demolition Asbestos Removal Licensed Heavy Machine Demolition Site Remediation Fully Documented & Insured Free On-Site Assessments Licensed NSW Builder Full Building Demolition Concrete & Steel Demolition Asbestos Removal Licensed Heavy Machine Demolition Site Remediation Fully Documented & Insured Free On-Site Assessments
/ When the whole structure needs to go

Demolition is construction
in reverse.

Full structural demolition is not about brute force. It requires planning, engineering, hazardous material management, and methodical execution. The demolition sequence, machine access, neighbour protection, services disconnection, and waste management all need to be planned before anything comes down.

METCON manages structural demolition as a proper construction project — with a plan, a sequence, and documentation. We handle permits, asbestos removal, services disconnection, the demolition itself, and site clearing — all under one contract.

Whether it's a residential home for a knock-down rebuild, a commercial building being cleared for redevelopment, or a structure that's reached end of life — we bring it down safely, clear the site, and hand it over ready for the next stage.

Get a demolition quote or call 0415 840 500
/ Six projects that need structural demolition
Knock-down rebuild requiring full home demolition
The existing home needs to come down completely, including foundations, for a new home to be built on the block.
Commercial building being cleared for redevelopment
Site cleared to ground level, services terminated, and the site prepared for new construction or sale.
Structure with widespread structural failure
When a building is unsafe and cannot be remediated economically, controlled demolition is the responsible solution.
Industrial building decommissioning
Factory, warehouse, or industrial building demolition with potential contamination assessment and remediation.
Fire or storm damaged structure
Structures damaged beyond repair need safe, controlled demolition with hazard assessment and insurance documentation.
Multi-storey building requiring staged demolition
Taller structures need top-down demolition, floor-by-floor, with specific machine access and engineering.
Need a building demolished? Send us the address, building details, and timeline — we'll plan the approach.
Email photos
/ What we demolish

Complete
structural removal.

From residential homes to multi-storey commercial buildings, we handle every type of structural demolition safely and compliantly.

01
Residential Demolition

Complete house demolition including asbestos removal, disconnection of services, foundation removal, and site clearing. Ready for new construction.

02
Commercial Demolition

Full commercial building demolition with engineering, staging plans, neighbour protection, and compliance documentation. CBD and suburban sites.

03
Concrete Demolition

Heavy reinforced concrete demolition using hydraulic breakers, crushers, and cutting equipment. Slabs, walls, columns, beams, and foundations.

04
Foundation Removal

Complete foundation removal including strip footings, pad footings, piles, and basement structures. Cleared to natural ground ready for new footings.

05
Hazardous Material Removal

Licensed asbestos removal, lead paint management, and contaminated material handling. Testing, removal, disposal, and clearance certification.

06
Waste & Recycling

Sorted waste disposal with maximum recycling of concrete, steel, timber, and other materials. Waste tracking and disposal records for compliance.

/ Our process

Planned, permitted,
and properly executed.

Every structural demolition follows our structured five-step process. Nothing comes down until the plan is complete and permits are in hand.

01
Step 01
Site Assessment & Survey

We inspect the structure, assess hazardous materials, survey neighbouring properties, and identify all services. This assessment drives the demolition plan.

02
Step 02
Permits & Notifications

Development application or CDC for demolition, SafeWork NSW notifications, utility disconnections, and neighbour notifications. All permits obtained before work starts.

03
Step 03
Hazard Removal

Asbestos and hazardous materials removed by licensed handlers before any structural demolition begins. Clearance certificates obtained.

04
Step 04
Structural Demolition

Building demolished per the engineered sequence. Machine demolition, hand demolition where required, dust suppression, and traffic management throughout.

05
Step 05
Site Clearing & Handover

Demolition waste removed, site levelled, underground services capped, and site handed over clean. All documentation and disposal records provided.

/ What you get
A cleared site —
with every box ticked.

Demolition permits, asbestos clearance, waste disposal records, site survey, and a clean site ready for the next stage. Fully documented.

/ Why choose METCON

Sydney's
structural demolition
builders.

We build buildings and we bring them down. Understanding how structures work makes us better at demolishing them safely. Engineering knowledge applied to every demolition project.

Builder & Demolisher

We build structures and demolish them — understanding both makes us safer and more efficient.

Hazard Management

Licensed asbestos handling, lead paint, and contaminated materials managed before any demolition begins.

Licensed Builder

Meteora Constructions Pty Ltd — fully licensed in NSW with all required insurances.

Permit Management

All demolition permits, notifications, and compliance requirements managed under one contract.

Neighbour Relations

Pre-condition surveys, dust management, vibration monitoring, and clear communication with neighbours.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

/ Where we work

Sydney-wide structural demolition.

We demolish buildings across Sydney — from suburban houses to commercial buildings and industrial structures.

Mosman Manly Cremorne Lane Cove Chatswood Hornsby Parramatta Strathfield Burwood Concord Hunters Hill Drummoyne Five Dock Leichhardt Newtown Surry Hills Paddington Bondi Randwick Coogee Maroubra Sutherland Hurstville Kogarah Cronulla Engadine Penrith Liverpool Campbelltown Wollongong Central Coast + Greater Sydney
/ Sydney coverage
Servicing Sydney metro & surrounding NSW regions
/ Need a building demolished? Let's plan it

Send us
the details.

The address, building type, approximate size, and your timeline. We'll assess the site, identify any hazardous materials, and come back with a demolition plan and clear price.

Back to Demolition & Excavation
Phone
0415 840 500
Direct line — speak to a builder
Email
info@meteoraconstructions.com.au
Send photos and we'll respond personally
Response time
Within 1 business day
Most enquiries answered same-day
Service area
Sydney & Greater NSW
On-site assessments anywhere in metro Sydney
Call Now