We deliver excavation services across Sydney for residential, commercial, and civil projects. From bulk earthworks to detailed footing excavation, every cut is to level, to plan, and to specification.
Everything built above ground depends on what happens below it. Excavation sets the levels, defines the footprint, and exposes the ground conditions that the rest of the project is built on.
We carry out machine and hand excavation for all types of construction. Bulk excavation for site levelling and basements. Detailed excavation for strip footings, pad footings, and pier holes. Trenching for services. Cut and fill for sloping sites. Pool excavation, retaining wall excavation, and drainage works.
We work from survey setout and engineering drawings. Levels, depths, and batter angles are checked throughout the dig. Soil conditions are monitored and reported where the geotechnical engineer requires it.
We match the equipment and method to the project. From tight residential sites to large-scale earthworks.
Large-volume earthmoving for site levelling, basement digs, and cut and fill operations. Managed with excavators, trucks, and precise level control.
Strip footings, pad footings, combined footings, and raft slab excavation. Dug to engineered depths and dimensions with clean, square edges.
Service trenches for stormwater, sewer, electrical, gas, and communications. Correct depths, grades, and bedding preparation for pipe and conduit installation.
Bored pier holes for piled foundations and retaining wall posts. Augered to specified diameter and depth, with soil classification recorded for the engineer.
Reshaping sloping sites to create level building platforms. Material balanced on site where possible to minimise spoil removal and import costs.
Excavation for swimming pools and below-ground structures. Tight access work with smaller machines where required. Shoring and retention as specified by the engineer.
Send us your plans or project details. We will review the scope, assess access and soil conditions, and provide a detailed quote for the excavation work.