We design, approve, and build granny flats and secondary dwellings across Sydney. Self-contained living, rental income, family accommodation. Properly built — not a kit home bolted together.
A granny flat is one of the best investments a Sydney homeowner can make. Rental income, family accommodation, a home office, or future-proofed downsizing — all from underused backyard space. But a granny flat is a real building that needs proper engineering, compliant construction, council approval, and quality finishes.
METCON builds granny flats as proper self-contained dwellings — with full kitchens, bathrooms, living areas, and bedrooms. Every granny flat is engineered, council-approved (typically via CDC), and built to the same standard as a new home.
Whether it's a studio for a young adult, a one-bedroom flat for rental income, or a two-bedroom dwelling for ageing parents — we design and build it to last, not as a temporary afterthought.
Every granny flat follows our structured five-step process. From planning check to key handover — one builder manages the entire build.
We check your block against council planning controls — lot size, setbacks, floor space ratio, and access requirements. You know upfront whether it's possible.
We design the granny flat to suit your block and needs. CDC (Complying Development Certificate) or DA submission managed through to approval. BASIX included.
Site preparation, excavation, service trenching, and foundation works. All connections coordinated before the building goes up.
Your granny flat is built from slab to finishes. Framing, cladding, roofing, waterproofing, plumbing, electrical, and complete fit-out. One builder, one contract.
Final inspections, occupation certificate, and full documentation. Your granny flat is ready for occupation — whether that's family, tenants, or yourself.
Council approval, structural engineering, compliance certificates, and quality construction. A granny flat built to the same standard as your main home.
Give us your address and we'll check the planning controls for granny flats on your block. If it's feasible, we'll discuss layout options and give you a realistic budget. No obligation, no cost.
Back to Residential Construction