Home Services Civil & Structural Structural Remediation
/ Structural Remediation · Sydney

Restoring
structural
integrity.

We diagnose, engineer, and repair structural defects in residential and commercial buildings across Sydney. Concrete cancer, structural cracking, failed lintels, foundation movement, water damage. Proper remediation — not patch jobs.

40+ YRS
Building Sydney
ENGINEER
Led & certified
FREE
No-obligation quote
/ Remediation · On site
Concrete remediation works · Sydney
Licensed NSW Builder Engineer-Certified Repairs Concrete Cancer Specialists Underpinning & Foundation Works Structural Crack Repair Carbon Fibre Reinforcement Fully Documented & Insured Free On-Site Assessments Licensed NSW Builder Engineer-Certified Repairs Concrete Cancer Specialists Underpinning & Foundation Works Structural Crack Repair Carbon Fibre Reinforcement Fully Documented & Insured Free On-Site Assessments
/ When structures fail

Buildings deteriorate.
We fix them properly.

Concrete spalls. Steel corrodes. Lintels fail. Cracks open up where they shouldn't. These aren't cosmetic issues — they're structural problems that get worse with time, and they get expensive fast.

METCON carries out structural remediation across Sydney, working with qualified structural engineers to assess damage, develop remediation plans, and execute repairs that restore the building to its required capacity. Every repair is engineered, documented, and certified.

Whether it's a single cracked beam in a Federation home or a full concrete cancer treatment on a commercial strata building — we approach every job the same way: thorough assessment, proper engineering, quality execution.

Book a free assessment or call 0415 840 500
/ Six warning signs you should not ignore
Rust stains seeping from concrete
A clear sign reinforcing steel is corroding inside the slab or column.
Cracks wider than a $2 coin (3mm+)
Anything beyond hairline cracking usually points to structural movement or load issues.
Cracks above doors or windows
Often indicates a failed or undersized lintel that needs engineered replacement.
Spalling, flaking or "popping" concrete
Classic early symptom of concrete cancer — gets worse and more expensive the longer it is left.
Doors and windows that suddenly stick
Frame distortion is one of the first signs of foundation movement.
Damp patches on internal walls
Water ingress compromises steel and timber structure — a structural risk, not just cosmetic.
Spot one of these in your building? Send us a photo — we'll tell you whether it's something to monitor or fix now.
Email photos
/ What we remediate

The full range of
structural defects.

Whatever the defect, the approach is the same — diagnose the cause, engineer the solution, execute and certify the repair.

01
Concrete Cancer

Spalling concrete caused by corroding reinforcement. We remove affected concrete, treat or replace steel, and apply protective coatings and engineered repair mortars to structural specifications.

02
Structural Cracking

Cracks in load-bearing walls, beams and columns from movement, overload or settlement. We assess root cause and execute engineered repairs — crack injection, stitching, carbon fibre reinforcement.

03
Failed Lintels

Deteriorated or undersized lintels above door and window openings. We design and install engineered replacement lintels with proper bearing, propping and load transfer.

04
Foundation Defects

Cracked or shifted foundations from reactive soils, drainage failure or tree root activity. We coordinate geotechnical and structural engineers to deliver the right underpinning method.

05
Structural Water Damage

Prolonged water ingress compromises steel reinforcement and timber members. We address the structural damage and coordinate waterproofing to prevent recurrence.

06
Load-Bearing Wall Repairs

Damaged or deteriorated load-bearing walls requiring temporary propping, demolition and engineered reconstruction. Compliant with NCC and engineer-stamped drawings.

/ Our process

No guesswork.
No improvising.

Every remediation project follows the same structured five-step process. Engineer-led, fully documented, and signed off in writing.

01
Step 01
Site Inspection

We attend site, inspect the structure, document the defects with photos and measurements, and identify the most likely cause. This becomes the brief for the structural engineer.

02
Step 02
Engineering Assessment

A qualified structural engineer reviews the inspection findings and produces a remediation specification. This document defines exactly what needs to be done and how.

03
Step 03
Remediation Plan

We develop a detailed scope of works from the engineering specification — methodology, staging, temporary support requirements, materials, and a clear, itemised quote.

04
Step 04
Execution On Site

Our team carries out the remediation to the engineer's specification. Work is documented at every stage with photos and inspection records you can rely on.

05
Step 05
Certification & Handover

On completion, the structural engineer inspects and certifies the work. You receive full documentation for your records, strata reports, council, or insurance.

/ What you get
A full paper trail —
not just a fixed building.

Inspection reports, engineer specifications, photos at every stage, and certification on completion. Useful for strata, council, insurance and resale.

/ Why choose METCON

Sydney's
structural remediation
specialists.

Most builders patch what's visible. We fix what's actually wrong. Every remediation project is engineer-led, documented end-to-end, and certified on completion — so the problem stays solved.

Engineer-Led

Every job is designed and signed off by a qualified structural engineer.

Documented

Photos, inspection notes, and certifications you can hand to strata, council or insurer.

Licensed Builder

Meteora Constructions Pty Ltd — fully licensed in NSW with all required insurances.

Honest Quoting

Itemised, fixed-price quotes. No surprise variations halfway through the job.

Strata-Friendly

Familiar with Owners Corporation requirements, committee approvals and reporting.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

/ Where we work

Sydney-wide structural remediation services.

We service all of Sydney and surrounding regions across NSW — from beachside strata buildings to inner-city heritage homes and outer-west commercial sites.

Mosman Manly Cremorne Lane Cove Chatswood Hornsby Parramatta Strathfield Burwood Concord Hunters Hill Drummoyne Five Dock Leichhardt Newtown Surry Hills Paddington Bondi Randwick Coogee Maroubra Sutherland Hurstville Kogarah Cronulla Engadine Penrith Liverpool Campbelltown Wollongong Central Coast + Greater Sydney
/ Sydney coverage
Servicing Sydney metro & surrounding NSW regions
/ Structural problem? Let's take a look

Send us
some photos.

We'll assess the situation, advise on next steps, and tell you honestly whether you need a full structural engineer report or just a minor repair. No pressure, no sales pitch — straight talk from people who actually build.

Back to Civil & Structural
Phone
0415 840 500
Direct line — speak to a builder
Email
info@meteoraconstructions.com.au
Send photos and we'll respond personally
Response time
Within 1 business day
Most enquiries answered same-day
Service area
Sydney & Greater NSW
On-site assessments anywhere in metro Sydney
Call Now