We design, form, pour, and finish concrete for residential and commercial projects across Sydney. Structural slabs, driveways, footings, retaining walls. Done right the first time — no shortcuts.
Concrete is the foundation of almost every structure in Sydney — literally. Get the mix wrong, the placement wrong, or the curing wrong, and you're paying to fix it later. Cracks, spalling, uneven surfaces, premature deterioration. Bad concrete shows up fast and costs a lot to repair.
METCON delivers concrete works across Sydney with qualified formworkers, steel fixers, and concreters working to engineer-specified mix designs and placement methods. Every pour is documented, tested, and built to last.
From a simple residential driveway to a multi-level structural slab — we bring the same standard of engineering, workmanship, and documentation to every job.
Every concrete project follows our structured five-step process. No guesswork, no improvising — just proven methodology.
We inspect the site, assess ground conditions, confirm levels and dimensions, and identify any access or staging requirements before we start.
The concrete work is specified by a structural engineer where required — mix design, reinforcement layout, slab thickness, and joint locations.
Our formworkers build forms to exact dimensions and levels. Steel fixers install reinforcement per the engineer's bar schedule. Inspected before pour.
Concrete is placed, vibrated, screeded, and finished to specification. Expansion and control joints are cut at the right time. Curing methods applied.
On completion, you receive documentation including test results, inspection records, and engineer certification where applicable.
Mix design records, slump test results, placement photos, and engineer certification. Everything you need for council, strata, or your own records.
Whether it's a new slab, a driveway replacement, or a structural pour — send us your plans or photos and we'll give you a clear, itemised quote. No pressure, no sales pitch.
Back to Civil & Structural