Home Services Retaining Walls Concrete Sleeper Retaining Walls Sydney
/ Concrete Sleeper Walls · Sydney

The strongest
sleeper wall
system.

We design, engineer, and build concrete sleeper retaining walls for residential and commercial sites across Sydney. Steel posts, precast sleepers, proper drainage. Engineered to hold — not lean.

40+ YRS
Building Sydney
ENGINEER
Designed & certified
FREE
No-obligation quote
/ Concrete sleeper wall · On site
Concrete sleeper retaining wall construction · Sydney
Licensed NSW Builder Concrete Sleeper Specialists Steel Post Systems Engineer-Designed Walls Council & CDC Compliant Drainage & Waterproofing Fully Documented & Insured Free On-Site Assessments Licensed NSW Builder Concrete Sleeper Specialists Steel Post Systems Engineer-Designed Walls Council & CDC Compliant Drainage & Waterproofing Fully Documented & Insured Free On-Site Assessments
/ Why concrete sleepers

Strong, clean,
and built to last.

Concrete sleeper walls are Sydney's most popular retaining wall system for good reason. They're strong, low maintenance, termite-proof, and work on most residential sites. But a sleeper wall is only as good as its engineering, its drainage, and the quality of its installation.

METCON builds concrete sleeper retaining walls engineered to suit the specific soil, height, and surcharge conditions of your site. Every wall is designed by a structural engineer, built with galvanised steel posts, and fitted with proper drainage.

Whether it's a simple 600mm garden wall or a 3-metre engineered retaining wall with a driveway surcharge — we build it to engineering standard, documented and certified.

Book a free assessment or call 0415 840 500
/ Six signs you need a concrete sleeper wall
Sloping block that needs levelling
Retaining walls create usable flat areas on sloping sites — concrete sleeper systems are ideal for most residential heights.
Existing timber wall rotting or leaning
Timber retaining walls have a limited lifespan. Concrete sleeper replacement is stronger and lasts significantly longer.
Boundary wall required between properties
Clean, neat concrete sleeper walls work well on boundaries with consistent face finish on both sides.
Retaining next to a driveway or building
Surcharge loads from driveways and structures need an engineered wall system — not just stacked sleepers.
Council requiring an engineered wall design
Walls over 600mm typically need engineering. Concrete sleeper systems have well-established design methods.
Low-maintenance retaining solution
Unlike timber, concrete sleepers don't rot, won't attract termites, and don't need staining or treatment.
Need a retaining wall quote? Send us site photos with measurements — we'll design and price it for you.
Email photos
/ What we build

Concrete sleeper walls
for every situation.

From simple garden walls to tall engineered retaining structures, we handle the full range of concrete sleeper construction.

01
Standard Sleeper Walls

Galvanised steel H-posts with concrete sleepers stacked between. Proper concrete footings, drainage, and geofabric. The go-to system for walls up to 1.2m.

02
Engineered Tall Walls

Walls from 1.2m to 3m+ requiring structural engineering. Larger posts, deeper footings, specific sleeper thicknesses, and drainage design matched to soil conditions.

03
Stepped & Terraced Walls

Multiple wall tiers stepping down a slope. Each tier independently engineered with appropriate setbacks and drainage between levels.

04
Boundary & Fence Walls

Clean-faced retaining walls on property boundaries. Level top for fencing, consistent finish both sides, and proper allowance for neighbour access.

05
Drainage & Waterproofing

Ag pipe, geofabric, gravel drainage layers, weep holes, and waterproof membranes where required. Proper drainage is what keeps retaining walls standing.

06
Post & Footing Systems

Galvanised steel H-posts set in engineered concrete footings. Post size, depth, and spacing matched to wall height and soil conditions.

/ Our process

Engineered walls.
Not guesswork.

Every retaining wall follows our structured five-step process. Designed by engineers, built by experienced retaining wall constructors.

01
Step 01
Site Assessment

We attend site, measure the wall length and height, assess soil conditions, note any surcharges (driveways, buildings), and identify drainage requirements.

02
Step 02
Engineering Design

A structural engineer designs the wall — post size and spacing, footing dimensions, sleeper thickness, and drainage specification matched to your site.

03
Step 03
Excavation & Footings

We excavate for the post footings and drainage system. Posts are set in concrete to the specified depth and alignment before sleepers are placed.

04
Step 04
Wall Construction

Concrete sleepers are placed between the steel posts. Ag pipe drainage is installed behind the wall with geofabric and gravel. Backfill is placed in controlled layers.

05
Step 05
Inspection & Handover

Engineer inspects the completed wall. You receive full documentation including design drawings, photos, and certification for council or your records.

/ What you get
A wall that holds —
with proof it was built right.

Engineering drawings, construction photos, drainage documentation, and engineer certification. Everything you need for council approval and property records.

/ Why choose METCON

Sydney's
concrete sleeper wall
specialists.

Every landscaper offers sleeper walls. Not every builder engineers them. We build retaining walls that are designed by structural engineers, drained properly, and built to last — not lean.

Engineer-Designed

Every wall is structurally designed for your specific site, soil, and height conditions.

Proper Drainage

Ag pipe, geofabric, and gravel drainage behind every wall — because water is what makes walls fail.

Licensed Builder

Meteora Constructions Pty Ltd — fully licensed in NSW with all required insurances.

Council Compliant

Documentation and certification ready for council DA, CDC, or exempt development requirements.

Quality Materials

Galvanised steel posts, quality precast sleepers, and proper concrete — no shortcuts on materials.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

/ Where we work

Sydney-wide concrete sleeper wall services.

We build concrete sleeper retaining walls across Sydney and surrounding regions — from harbourside slopes to western suburbs estates.

Mosman Manly Cremorne Lane Cove Chatswood Hornsby Parramatta Strathfield Burwood Concord Hunters Hill Drummoyne Five Dock Leichhardt Newtown Surry Hills Paddington Bondi Randwick Coogee Maroubra Sutherland Hurstville Kogarah Cronulla Engadine Penrith Liverpool Campbelltown Wollongong Central Coast + Greater Sydney
/ Sydney coverage
Servicing Sydney metro & surrounding NSW regions
/ Need a retaining wall? Let's design it right

Send us
site photos.

Take a few photos of the slope, mark the approximate wall length and height, and send them through. We'll design an engineered concrete sleeper wall and give you a clear price. No pressure.

Back to Retaining Walls
Phone
0415 840 500
Direct line — speak to a builder
Email
info@meteoraconstructions.com.au
Send photos and we'll respond personally
Response time
Within 1 business day
Most enquiries answered same-day
Service area
Sydney & Greater NSW
On-site assessments anywhere in metro Sydney
Call Now