Home / Services / Civil & Structural Works
/ Service · Civil & Structural

Structural
work you
can trust.

We deliver civil and structural construction across Sydney. From foundation repairs to concrete pours, every job is engineered, compliant, and built to last.

40+
Yrs structural
318592C
Builder licence
DBP
Unrestricted
AS 2159 · Piling Design AS 3600 · Concrete Structures AS 4100 · Steel Structures AS 4678 · Earth Retaining NCC / BCA Compliant Council Approved NSW Fair Trading 318592C DBP BUP4254812 AS 2159 · Piling Design AS 3600 · Concrete Structures AS 4100 · Steel Structures AS 4678 · Earth Retaining NCC / BCA Compliant Council Approved NSW Fair Trading 318592C DBP BUP4254812
/ What we do

The work that holds
everything together.

Our civil and structural division handles foundations, load-bearing walls, concrete structures, reinforcement, and remediation. Residential, commercial, and civil — across Sydney and surrounding regions.

  • Work to structural engineer specifications and drawings
  • AS 2159, AS 3600, AS 4100 compliant construction
  • Council-approved methodologies and notifications
  • Full documentation and certification on every job
  • Coordination with engineers, surveyors, and certifiers
  • Concrete cancer treatment and structural strengthening
/ Five disciplines · One contractor

Our structural
services

Each discipline requires specific knowledge, equipment, and methodology. We cover the full scope of civil and structural work.

01

Structural Remediation

Restoring structural integrity to damaged or deteriorated buildings. Cracked walls, failed lintels, concrete cancer, and foundation defects.

Learn more
02

Underpinning

Foundation stabilisation and strengthening for buildings affected by subsidence, settlement, or increased load requirements.

Learn more
03

Staircase Construction

Concrete and steel staircases for residential and commercial projects. Engineered, formed, poured, and finished to BCA/NCC standards.

Learn more
04

Concrete Works

Slabs, footings, columns, beams, walls, driveways, and paths. Proper preparation, formwork, reinforcement, and finishing on every pour.

Learn more
05

Formwork & Steel Fixing

Formwork construction and reinforcement placement for concrete structures. Timber and steel systems built to engineering drawings.

Learn more
/ Engineering discipline

Built on engineering.
Delivered by builders.

Structural work demands precision. We work directly with structural and geotechnical engineers to deliver construction that meets Australian Standards and council requirements.

No shortcuts. No guesswork. Every joint, every pour, every connection is sized, specified, and signed off.

/ How we deliver

Our process

Four disciplined stages. Every milestone documented, every handoff signed.

01
Stage 01

Site Assessment

We inspect the site, identify structural concerns, and review your engineering reports or arrange them if needed.

02
Stage 02

Engineering Coordination

We coordinate with structural and geotechnical engineers, prepare methodology statements, and lodge council applications.

03
Stage 03

Construction

Work executed by experienced crew to engineer specifications and Australian Standards. Progress reported, milestones documented.

04
Stage 04

Certification & Handover

Final inspection, defect rectification, and formal handover with engineering certificates, as-built records, and compliance documentation.

/ Why our clients choose us

Why our clients
choose us

Engineer-Led Process

We work from structural engineer drawings and specifications. Every detail is followed. No improvising on site.

Licensed & Insured

Fully licensed NSW builder (318592C) with comprehensive insurance and DBP General-Unrestricted registration. We handle the compliance so you do not have to.

Sydney Knowledge

We understand Sydney soils, council requirements, and site conditions. That local knowledge makes a measurable difference on every project.

Documentation

Full records, inspection reports, and certification for every stage. Your engineer and certifier get exactly what they need.

/ From the journal

More about civil &
structural from our blog

View all articles
Structural 12 May 2026 6 min read

Concrete Cancer in Sydney: Spotting It Early, Fixing It Properly

Salt-laden coastal air and ageing reinforcement are the main drivers behind concrete cancer in Sydney apartments. Here is how we diagnose it and what proper remediation looks like.

Read article
Underpinning 28 Apr 2026 8 min read

When Your Sydney Home Needs Underpinning — and What It Costs

Subsidence on clay soils, leaking pipes, and tree roots are the three most common triggers for underpinning in NSW. A breakdown of methods, timelines and price ranges.

Read article
Concrete 14 Apr 2026 5 min read

Choosing the Right Concrete Mix for Sydney Conditions

N20, N25, N32, N40 — and what each one is good for. A practical guide for homeowners and builders specifying concrete works in the Sydney basin.

Read article
/ Frequently asked

Civil & structural
FAQs

Common questions about structural construction, concrete works, underpinning, and remediation in Sydney and NSW.

Q · 01 How much does structural work cost in Sydney?
Structural work in Sydney varies significantly with scope, engineering complexity, and access. A typical concrete slab pour for a residential extension starts around $180–$280 per m²; full underpinning to a small Sydney terrace usually sits between $25,000 and $80,000 depending on depth, soil type, and the number of piers. Concrete cancer remediation on a single apartment balcony commonly ranges $8,000–$25,000+. We always provide a free, detailed, written quote — no estimating over the phone for structural work.
Q · 02 Do I need a structural engineer for renovations in NSW?
Yes — any time you remove or alter a load-bearing wall, change the foundation, add a storey, or make changes that affect the structural integrity of a building, NSW law requires a structural engineer to certify the design. Under the Design & Building Practitioners Act 2020, any "regulated design" for Class 2 buildings (apartments) must be prepared and lodged by a registered practitioner. METCON coordinates with engineers from day one — we can recommend one or work with yours.
Q · 03 What is concrete cancer and how is it treated?
Concrete cancer (technically "concrete spalling") occurs when steel reinforcement inside concrete rusts and expands, cracking the concrete from within. It is extremely common in coastal Sydney apartments built in the 1960s–1990s. Treatment involves: exposing the affected steel, mechanically cleaning it, applying corrosion inhibitor and anti-carbonation coating, replacing lost concrete with engineered repair mortar, and reinstating waterproofing. Properly done, it lasts 20+ years; done poorly, it returns within five.
Q · 04 How long does underpinning take?
A typical Sydney underpinning project takes 2–6 weeks depending on number of piers, depth required, and site access. Mass concrete underpinning to a small residential wall might take a week; full perimeter underpinning to a two-storey home with screw piles or bored piers can run 4–6 weeks. We work in staged sections so structural support is never compromised — and so the home stays occupied throughout in most cases.
Q · 05 Is council approval needed for structural work in NSW?
It depends on the work. Internal alterations that do not affect external appearance or load-bearing elements can often proceed under Exempt & Complying Development (CDC). Anything affecting structural elements, the building envelope, foundations, or in a heritage zone typically requires a Development Application (DA). METCON handles the lodgement, methodology statements, traffic management plans, and certifier coordination as part of our project management.
Q · 06 What is the difference between civil and structural works?
Structural works deal with the load-bearing elements of a building — footings, slabs, columns, beams, walls. Civil works deal with the wider site infrastructure — retaining walls, drainage, excavation, earthworks, driveways, paths, and connections to public services. Most real projects involve both. METCON delivers civil and structural together, which removes coordination friction between trades and is usually faster and cheaper than splitting them across two contractors.
Q · 07 Can METCON handle concrete cancer in strata buildings?
Yes. Concrete cancer remediation is one of our core remedial specialties. We work with strata managers and owners corporations across Sydney to scope, engineer, and stage works around occupied apartments — including resident notifications, access scheduling, and dust/noise management. Our DBP General-Unrestricted registration (BUP4254812) clears us for any class of strata building with no height limit.
Q · 08 Which Australian Standards do you build to?
For civil and structural work, the relevant standards include AS 2159 (piling design and installation), AS 3600 (concrete structures), AS 4100 (steel structures), AS 4678 (earth-retaining structures), and the National Construction Code (NCC/BCA). All work is also Fair Trading and DBP-compliant and is signed off by registered engineers and certifiers.
Got a different question?

Pick up the phone or send us a brief about your site. We'll come out, take a look, and answer it properly.

Ask Us
/ Ready when you are

Ready to start
your project?

Tell us what you need. We'll review the scope, coordinate with your engineer, and provide a clear quote — no obligation.

Call Now