We engineer, design, and deliver structural upgrades for commercial and industrial buildings across Sydney. Load capacity, new openings, mezzanines, equipment platforms. Making existing buildings do more — safely.
Business needs change. You need to install heavier equipment, add a mezzanine floor, open up a load-bearing wall for a bigger shopfront, or increase the live load capacity for a change of use. These are structural changes that need engineering — not guesswork.
METCON delivers structural upgrades for commercial buildings, working with structural engineers to assess existing capacity, design strengthening or modification solutions, and execute them in occupied buildings. Every upgrade is engineered, documented, and certified.
Whether it's adding steel beams to support a new mezzanine or carbon fibre strengthening of existing concrete members — we bring the right skills and experience to every structural modification.
Every structural upgrade follows our structured five-step process. The existing structure is assessed first — then we design around what's actually there.
We inspect the existing building, review original drawings where available, and assess current structural capacity. This data drives the engineering design.
A qualified structural engineer designs the upgrade — strengthening method, new members, connections, and construction sequence. Nothing is assumed.
We develop the construction methodology around the building's operations. Staging, temporary support, access, and disruption management planned in detail.
Our team carries out the structural works per the engineer's specification. Welding, bolting, propping, and concrete work documented at every hold point.
Engineer inspects and certifies the completed upgrade. Full documentation provided — design, construction records, and certificates for BCA compliance.
Structural design, construction documentation, test records, and engineer certification. Everything needed for BCA compliance, insurance, and building records.
Tell us what you need the building to do that it currently can't. We'll coordinate the structural assessment and come back with an engineered solution and clear price. Straight answers from builders who understand structure.
Back to Commercial Construction