Strata committees often get three quotes for concrete cancer repairs and find the highest is several times the lowest. It is tempting to pick the cheapest. Usually the difference is not efficiency. It is scope: the quotes are for different jobs.
Why quotes differ
- Quantities. One quote allows for a few square metres of repair, another for far more. Concrete cancer is hidden, so quantities are estimates.
- Rates vs lump sum. Some quote a lump sum, others a rate per square metre or per repair with a provisional quantity.
- Depth of repair. Shallow patching is cheaper than cutting behind the bars as specifications require.
- Waterproofing. Some include new membranes and tiling, others only the concrete.
- Access. Scaffold, swing stages and propping can be a big part of the cost.
- Exclusions. Engineer inspections, testing, permits, making good finishes and waste disposal may be left out.
How to compare properly
- Get a written scope or specification from an engineer, so everyone prices the same work. See remedial scope of works.
- Ask every builder to price the same quantities and list rates for extra work.
- Line up the inclusions and exclusions side by side.
- Check licences, DBP registration for Class 2 buildings, insurance and home warranty where required.
- Ask how each repair will be recorded: photos before breakout, after breakout and on completion.
Red flags
- No mention of treating or replacing corroded steel.
- No allowance for the waterproofing that caused the problem.
- Vague quantities with no rates for extra repairs.
- Pressure to sign quickly or pay a large deposit upfront.
Rates for the unknown
Because nobody knows the full extent until concrete is opened up, a good contract has clear rates for extra repairs, agreed measurement and photos as evidence. That protects both the owners and the builder. See variations and provisional sums.
Clear, comparable quotes
We price concrete cancer work against the engineer's scope, list rates for extra repairs and photograph every repair. See concrete cancer repair. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Should we always take the cheapest quote?
Only if it covers the same scope, quantities and standard of work. Otherwise it is not really cheaper.
Why do builders use rates instead of a fixed price?
Because the extent of concrete cancer is hidden until the concrete is opened. Rates let the price follow the actual quantity.
Do we need an engineer before getting quotes?
For anything beyond a small repair, yes. A specification makes quotes comparable and protects the owners.


