Apartment buildings around Sydney Harbour have some of the best outlooks in the country. They are also exposed to salt, wind and driving rain every day. For owners in places such as Kirribilli, Milsons Point, McMahons Point, Lavender Bay and Elizabeth Bay, staying on top of maintenance protects both the building and its value.
What harbour exposure does
- Salt in the concrete: chlorides reach the steel and start rust that can cause concrete cancer. See also carbonation vs chloride.
- Driving rain: wind pushes water into joints, windows and door sills that would stay dry on a sheltered wall.
- Corroding metal: balustrades, fixings, window frames and lintels all corrode faster near the water. See loose and rusted balustrades.
- Coatings and sealants: sun, salt and movement shorten their life, particularly on north and west faces.

Older buildings are most at risk
Many harbourside apartment buildings from the 1950s to the 1970s have less concrete cover over the steel than a modern building would. See 1960s and 1970s blocks. Original balcony waterproofing may also be long past its life.
Warning signs
- Rust stains or cracks along slab edges.
- Drummy render and flaking paint on exposed faces.
- Balcony leaks onto the unit below.
- Loose or stained balustrade posts.
- Salt marks and crystals on walls and soffits.
What to do about it
- Inspect regularly. A condition report every few years shows trends before they become emergencies. See building condition reports.
- Repair what has started. Repairs should treat the cause and not just patch the surface.
- Protect repaired areas. Good membranes, coatings and sealants slow down future damage.
- Plan the money. Include harbour-exposed elevations in your capital works fund plan.
Access on the water
Waterfront sites and narrow streets can make access harder, and scaffold or material deliveries take more planning. See facade access options.
How remediation helps your building
Well-timed repairs protect the structure, keep balconies safe and usable, and help keep values strong, because buyers increasingly check strata records for repairs. See buying an apartment with defects.
Repairs for harbourside buildings
We repair balconies, concrete and facades on apartment buildings around the harbour. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How does salt air damage apartment buildings?
Salt penetrates concrete and reaches the reinforcing steel, which starts to rust and expand. It also shortens the life of sealants, coatings and metal fixings.
How far from the water does salt affect a building?
It depends on wind and exposure. The effect is usually strongest right by the water and on the elevations that face it, but salt can travel well inland.
How often should a harbourside building be inspected?
Every few years is a sensible guide, and more often if there are known problems or the building is older and very exposed.

