Apartment buildings close to the beach in Bondi, Coogee, Maroubra, Manly and Cronulla take salt spray and wind-driven rain every day. Their balconies tend to need repairs sooner than buildings inland.
What sea air does
- Chlorides reach the steel and cause concrete cancer. See concrete cancer in coastal buildings.
- Balustrades, fixings and drains corrode faster.
- Sealants and coatings break down sooner.
- Sand and salt block drains.

Repairing to last near the sea
- Thorough break-out to sound concrete and clean steel.
- Repair mortars and coatings suited to marine exposure.
- Consider extra protection where chlorides are high, on engineer's advice.
- Corrosion-resistant balustrades and fixings. See balustrade replacement.
- Good drips and drainage. See drip grooves.
Testing first
Chloride testing shows how far salt has gone, which affects the repair method. See concrete testing.
Maintenance
- Rinse salt off balustrades and glass.
- Keep drains clear of sand.
- Inspect more often than inland buildings.
How repairs help
Doing it properly once, with marine-suited materials, avoids repeated patching and keeps beachside apartments safe and valuable.
Beachside balcony repairs
We repair balconies on coastal apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why do beachside balconies get concrete cancer?
Salt from sea air reaches the steel in the concrete and speeds up corrosion.
Do repairs near the beach need special materials?
Often, yes. Repair mortars, coatings and fixings suited to marine exposure last longer.
How often should beachside balconies be inspected?
More often than inland buildings, especially elevations facing the sea.

