Before a single footing is poured, a lot has to happen on site. Skipping steps here leads to clashes with services, drainage problems, neighbour complaints and footings in the wrong place. Here is the order we follow.
1. Surveys and investigation
- Detail and level survey, with boundaries identified.
- Geotechnical investigation of soil and rock, for footing design.
- Trees identified, with any protected trees marked.
2. Services
- Lodge an enquiry with Before You Dig Australia (BYDA).
- Have services located and marked on site.
- Arrange disconnection of services to buildings being demolished.
3. Approvals and conditions
Read the development consent or complying development certificate conditions. They often cover working hours, erosion control, tree protection, dilapidation reports, noise and traffic arrangements.
4. Demolition and clearing
- Hazardous materials survey before demolition of older structures.
- Demolition and removal of structures, slabs and footings.
- Clearing vegetation, with tree protection for retained trees.
- Stripping and stockpiling topsoil for reuse.
5. Erosion and sediment control
Silt fences, a stabilised site entry and protection of kerb inlets, in place before earthworks start. See erosion and sediment control.
6. Access and site setup
- Site fencing and signage.
- Driveway access and protection of the footpath and kerb.
- Amenities and material storage areas.
7. Earthworks and set-out
- Bulk excavation or cut and fill to design levels. See cut and fill.
- Surveyor set-out of building lines and levels.
- Footing excavation and inspection before concrete.
Site preparation
We handle demolition, clearing, earthworks and site setup ready for building. See site clearing and excavation. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
How long does site preparation take?
It depends on demolition, trees, rock and access. Simple sites can be ready in days; complex sites take weeks.
Do I need a geotechnical report?
For new buildings and significant retaining walls, usually yes. It sets the footing design.
Can trees be removed during clearing?
Only those approved for removal. Protected trees need council approval and protection during works.