Civil Works for Duplex and Granny Flat Sites: A Site Works Checklist

23 November 2026 · 4 min read · By the METCON team

Duplexes and granny flats are a big part of Sydney's new housing. Whatever the design, the site has to be prepared first, and on sloping or tight blocks, civil works can be a big share of the job. Sorting them out early avoids surprises in cost and program.

The checklist

  1. Survey and geotechnical report. Levels, boundaries, services and ground conditions. See geotechnical reports.
  2. Demolition and clearing. Old house, sheds, pools, trees with council approval, and hazardous materials testing. See demolition and site clearing.
  3. Erosion and sediment control. Required before earthworks begin. See erosion control.
  4. Excavation and cut and fill. Creating level pads, removing rock where needed.
  5. Retaining walls. Where the site is cut or filled, often along boundaries.
  6. Stormwater. Pits, pipes, OSD or rainwater tanks and a legal point of discharge. See OSD.
  7. Services. Trenches for water, sewer, power and data, by the relevant licensed trades.
  8. Footings and slabs. To the engineer's design.
  9. Driveways and crossings. Shared or separate driveways and the council vehicle crossing. See vehicle crossings.
Retaining walls create level pads on sloping blocks.
Retaining walls create level pads on sloping blocks.

Sloping blocks

On a sloping block, retaining walls, excavation and stormwater can be the difference between a simple and a complicated project. A block falling away from the street may need a drainage easement or pump system. See drainage easements.

Access and neighbours

Tight access affects which machines can be used. Excavation near boundaries may need shoring, and dilapidation reports on neighbouring houses are good practice.

One contractor for the site works

Using one contractor for demolition, excavation, retaining walls and drainage keeps the levels coordinated and hands the builder a ready site.

Site works for duplexes and granny flats

We deliver demolition, excavation, retaining walls, drainage works and concrete for duplex and granny flat projects. See civil and structural works and excavation. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.

Frequently asked questions

Do granny flats need retaining walls?

On sloping blocks, usually yes, where the pad is cut into the slope or fill is placed.

Who handles stormwater design?

A civil or hydraulic engineer designs it, and licensed plumbers or drainers make the connections.

Can site works start before the building approval?

Usually not. Most site works need the development consent or complying development certificate first.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Civil & Structural
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote