A vehicle crossing, also called a driveway crossover, is the section of driveway that crosses the council footpath and kerb between your boundary and the road. Because it is on public land, councils control how it is designed and built.
When you need approval
- A new driveway or a new crossing location.
- Widening an existing crossing.
- Replacing a damaged crossing.
- Removing an old crossing and reinstating the kerb.
The usual process
- Apply to council for a vehicle crossing approval, often with a plan.
- Council issues the boundary and footpath levels the crossing must meet.
- Works are carried out by the council or a contractor approved under council's rules, to council's specification.
- Council inspects the formwork before concrete and the finished crossing.
Each council's process, fees and specifications differ. Check with your council early, because the levels affect your driveway and garage design.
Things that complicate a crossing
- Street trees close to the crossing.
- Stormwater pits, poles or services in the way.
- Steep footpaths that make the levels hard to meet.
- Bus stops, parking restrictions or nearby intersections.
Footpath protection during works
During building works, councils often require the footpath and kerb to be protected, and a damage deposit may be held. Damage to council assets must be repaired.
Match the driveway to the crossing
The crossing levels at the boundary fix the start of your driveway. Steep sites need careful transitions. See steep driveways.
Driveways and crossings
We build driveways and coordinate vehicle crossings to council requirements. See concrete works and concrete driveway cost. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
Can I build the crossing myself?
Usually not. Councils require their own crews or approved contractors, built to their specification.
How long does a crossing approval take?
It varies by council. Apply early so it does not hold up the driveway.
Who pays to fix a cracked crossing?
It depends on the council's policy. Many treat the crossing as the property owner's responsibility.