Sloping Sydney sites often have cuttings, embankments and natural slopes that are slowly moving. After heavy rain, soil slips, rocks fall from cuttings and retaining walls lean. Stabilising a slope starts with understanding why it is moving.
Signs of an unstable slope
- Cracks in the ground at the top of the slope.
- Bulging at the toe.
- Leaning trees, fences and walls.
- Rock falling from a cutting.
- Water seeping from the face after rain.
- Paths, driveways or slabs cracking near the slope.
If movement is active after rain, keep people clear and get a geotechnical engineer to assess it.

Why slopes fail
- Water: saturated soil is heavier and weaker.
- Cuttings that are too steep for the soil or rock.
- Fill placed without compaction.
- Loads at the top, such as buildings, pools and driveways.
- Loss of vegetation.
Stabilisation options
| Method | Suits |
|---|---|
| Drainage: cut-off drains, subsoil drains | Almost every slope, often the first step |
| Regrading to a flatter batter | Where there is room |
| Gabion walls | Soil slopes, wet sites, natural look |
| Retaining walls | Where space is tight |
| Rock bolts and mesh | Jointed sandstone cuttings |
| Soil nails with shotcrete | Steep soil cuttings |
| Planting and erosion matting | Surface protection on stable batters |
See gabion walls and rock excavation.
Engineering and approvals
Slope stabilisation should be designed by a geotechnical engineer, and councils in landslip-prone areas often have specific requirements. Some areas of Sydney are mapped for geotechnical risk, which affects what can be built.
Slope stabilisation works
We build drainage, gabion walls, retaining walls and stabilisation works on Sydney slopes, to geotechnical designs. See retaining walls and civil works. METCON is a licensed NSW builder (384697C) delivering civil works, excavation and retaining walls across Sydney. Call 0415 840 500 or request a quote.
Frequently asked questions
Can I fix a slipping bank with plants alone?
Only for shallow surface erosion on an otherwise stable slope. Deeper movement needs engineering.
Who is responsible for a slope between two properties?
It depends on ownership and what caused the movement. Get advice and a geotechnical assessment.
How quickly should I act?
Quickly. Slopes often fail after heavy rain, and small repairs now avoid big ones later.


