Checking a builder's licence takes two minutes and is the single best way to avoid the worst building disasters. Here is how to do it in NSW, and what else to check.
When a licence is required
In NSW, anyone doing residential building work worth more than $5,000 (including GST, labour and materials) must hold the appropriate contractor licence. Specialist work such as electrical, plumbing and gas always requires a licence.
How to check a builder's licence
- Use the NSW Government online licence check (search "verify a licence NSW").
- Search by the builder's name, company name or licence number.
- Check the result carefully.
What to look for
- The name matches the person or company on your quote and contract.
- The licence is current, not expired, suspended or cancelled.
- The class covers your work: a builder licence for general building work, or the right trade category.
- Conditions on the licence that limit the work they can do.
- Disciplinary history and public warnings.
Other checks before you sign
- Home building compensation (HBCF) cover for residential work over $20,000. Ask for the certificate and verify it with icare. See HBCF insurance explained.
- DBP registration for work on Class 2 apartment buildings. See Class 2 builders.
- Public liability and workers compensation certificates.
- A written contract, required in NSW for residential work over $5,000.
- Deposits: in NSW, deposits for residential building work are capped at 10% of the contract price.
- References and recent work similar to yours.
Red flags
- A licence number that does not match the name on the quote.
- Pressure to pay large deposits or cash.
- No written contract or insurance certificate.
- Reluctance to give a licence number at all.
Check us
METCON holds NSW Builder Licence 384697C, DBP registration BUP4254812 (General Unrestricted) and Demolition Licence AD214430. See our services or call 0415 840 500.
Frequently asked questions
How do I check a builder's licence in NSW?
Use the NSW Government online licence check, search by name or licence number, and confirm the licence is current and covers your work.
When does a builder need a licence in NSW?
For residential building work over $5,000 including GST, and always for specialist work such as electrical, plumbing and gas.
What is the maximum deposit a builder can take in NSW?
For residential building work, deposits are capped at 10% of the contract price.

